A Multi-Skilled Mathematical Model of Bacterial Attachment in Initiation of Biofilms

被引:4
|
作者
Chathoth, Kanchana [1 ]
Fostier, Louis [2 ]
Martin, Benedicte [1 ]
Baysse, Christine [1 ,3 ]
Mahe, Fabrice [2 ]
机构
[1] Univ Rennes 1, CIMIAD, NUMECAN INSERM U1241, F-35043 Rennes, France
[2] Univ Rennes, IRMAR, CNRS UMR 6625, F-35000 Rennes, France
[3] Univ Rennes, Inst Genet & Dev Rennes IGDR, CNRS UMR 6290, F-35000 Rennes, France
关键词
biofilm; bacterial attachment; mathematical model; Porphyromonas gingivalis; Streptococcus gordonii; Treponema denticola; iron; PORPHYROMONAS-GINGIVALIS; TREPONEMA-DENTICOLA; MICROBIAL BIOFILMS; QUANTIFICATION; IDENTIFICATION; SEQUENCE;
D O I
10.3390/microorganisms10040686
中图分类号
Q93 [微生物学];
学科分类号
071005 ; 100705 ;
摘要
The initial step of biofilm formation is bacteria attachment to biotic or abiotic surfaces and other bacteria through intra or interspecies interactions. Adhesion can be influenced by physicochemical conditions of the environment, such as iron. There is no available mathematical model of bacterial attachment giving realistic initiation rather than random adhesion. We describe a simple stochastic attachment model, from the simplest case in two dimensions with one bacterial species attaching on a homogeneous flat surface to more complex situations, with either several bacterial species, inhomogeneous or non-flat surfaces, or in three dimensions. The model depends on attachment probabilities (on the surface, laterally, or vertically on bacteria). Effects of each of these parameters were analyzed. This mathematical model is then applied to experimental oral microcolonies of Porphyromonas gingivalis, Streptococcus gordonii, and Treponema denticola, either as mono-, two, or three species, under different iron concentrations. The model allows to characterize the adhesion of three bacterial species and explore the effect of iron on attachment. This model appears as a powerful tool for initial attachment analysis of bacterial species. It will enable further modeling of biofilm formation in later steps with biofilm initialization more relevant to real-life subgingival biofilms.
引用
收藏
页数:23
相关论文
共 50 条
  • [41] A mixed integer programming approach to multi-skilled workforce scheduling
    Rodolfo Cuevas
    Juan-Carlos Ferrer
    Mathias Klapp
    Juan-Carlos Muñoz
    Journal of Scheduling, 2016, 19 : 91 - 106
  • [42] Load-balancing for multi-skilled servers with Bernoulli routing
    Fernando Miguelez
    Josu Doncel
    Balakrishna J. Prabhu
    Annals of Operations Research, 2022, 312 : 949 - 971
  • [43] Optimization of Multi-Skilled Labor with the Application of Partial Allocation of Resources
    Saleh, Amira A.
    Abotaleb, Ibrahim S.
    Hosny, Ossama A.
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 451 - 460
  • [44] A SIMULATION TOOL FOR COMPLEX ASSEMBLY LINES WITH MULTI-SKILLED RESOURCES
    Angelidis, Evangelos
    Bohn, Daniel
    Rose, Oliver
    2013 WINTER SIMULATION CONFERENCE (WSC), 2013, : 2577 - 2586
  • [45] Management of out of hours vascular emergencies - multi-disciplinary or multi-skilled?
    Donnelly, MP
    McCormick, P
    Tierney, S
    Feeley, TM
    BRITISH JOURNAL OF SURGERY, 2003, 90 : 38 - 38
  • [46] SPECIALIZATION OF SOUTH AFRICAN JUDGES AND COURTS: MULTI-SKILLED, MULTITASKED, MULTIACCESS?
    Van Logerenberg, Danie
    RUSSIAN LAW JOURNAL, 2014, 2 (04) : 187 - 203
  • [47] Training and assignment of multi-skilled workers for implementing seru production systems
    Liu, ChenGuang
    Yang, Na
    Li, WenJuan
    Lian, Jie
    Evans, Steve
    Yin, Yong
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (5-8): : 937 - 959
  • [48] Stochastic project management: multiple projects with multi-skilled human resources
    Felberbauer, Thomas
    Gutjahr, Walter J.
    Doerner, Karl F.
    JOURNAL OF SCHEDULING, 2019, 22 (03) : 271 - 288
  • [49] Stochastic project management: multiple projects with multi-skilled human resources
    Thomas Felberbauer
    Walter J. Gutjahr
    Karl F. Doerner
    Journal of Scheduling, 2019, 22 : 271 - 288
  • [50] An Instance Generator for Project Scheduling Problems with Multi-Skilled Personnel Constraints
    Wang Yifan
    Chen Di
    Liu Shixin
    Zeng Qingfu
    PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 3430 - 3435