共 50 条
- [1] Production Scheduling using Augmented Lagrangian Relaxation and Genetic Algorithm Optimization [J]. PROCEEDINGS OF THE 24TH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, IMCET 2015, 2015, : 788 - 796
- [3] Integration of Production Planning and Scheduling [J]. 10TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, 2009, 27 : 117 - 118
- [5] Production scheduling problem and solver improvement via integration of the grey wolf optimizer into the augmented Lagrangian relaxation method [J]. SN APPLIED SCIENCES, 2020, 2 (12):
- [6] Production scheduling problem and solver improvement via integration of the grey wolf optimizer into the augmented Lagrangian relaxation method [J]. SN Applied Sciences, 2020, 2
- [8] A hybrid augmented Lagrangian multiplier method for the open pit mines long-term production scheduling problem optimization [J]. Journal of Mining Science, 2014, 50 : 1047 - 1060