共 50 条
- [1] A hybrid augmented Lagrangian multiplier method for the open pit mines long-term production scheduling problem optimization [J]. Journal of Mining Science, 2014, 50 : 1047 - 1060
- [2] Improvement of Lagrangian relaxation performance for open pit mines constrained long-term production scheduling problem [J]. Journal of Central South University, 2014, 21 : 2848 - 2856
- [6] Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation [J]. OREBODY MODELLING AND STRATEGIC MINE PLANNING: UNCERTAINTY AND RISK MANAGEMENT MODELS, 2005, (14): : 359 - 365
- [8] LONG TERM PRODUCTION SCHEDULING OF OPEN PIT MINES, A REVIEW OF OLD AND NEW ALGORITHMS [J]. SGEM 2008: 8TH INTERNATIONAL SCIENTIFIC CONFERENCE, VOL I, CONFERENCE PROCEEDINGS: MODERN MANAGEMENT OF MINE PRODUCING GEOLOGY AND ENVIRONMENTAL PROTECTION, 2008, : 477 - 485
- [9] Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging [J]. Journal of Mining Science, 2015, 51 : 1226 - 1234