A hybrid augmented Lagrangian multiplier method for the open pit mines long-term production scheduling problem optimization

被引:9
|
作者
Moosavi, E. [1 ]
Gholamnejad, J. [2 ]
Ataee-pour, M. [3 ]
Khorram, E. [4 ]
机构
[1] Islamic Azad Univ, Dept Min Engn, Sci & Res Branch, Tehran, Iran
[2] Yazd Univ, Dept Min & Met Engn, Yazd 89195741, Iran
[3] Amirkabir Univ Technol, Dept Min & Met Engn, Tehran, Iran
[4] Amirkabir Univ Technol, Dept Appl Math & Comp Sci, Tehran, Iran
关键词
Open pit mine; long-term production scheduling problem; augmented Lagrangian relaxation; genetic algorithm; optimization;
D O I
10.1134/S1062739114060076
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
To improve the quality of decision making in the mining operation, it is essential to find global optimum in problems with large dimensional scales. It is widely accepted that Long-term production scheduling (LTPS) problem is playing key role in mining projects to improve their performance by considering availability constraints while maximizing the project total profits during the period. Since production scheduling problems are NP-hard, there is need of improving scheduling methodologies to get good solution. This paper presents a hybrid model between augmented Lagrangian relaxation (ALR) and Genetic algorithm (GA) to solve the LTPS problem. We propose to apply the ALR method on the LTPS problem which to improve its performance speeding up the convergence and also, GA is used to update the Lagrangian multipliers. The results from case study show that the ALR method is effective in solving large-scale problem and generation a feasible solution then the traditional linearization method. Furthermore, the proposed hybrid strategy based on GA showed better performance in comparison to the available methods.
引用
收藏
页码:1047 / 1060
页数:14
相关论文
共 50 条
  • [1] A hybrid augmented Lagrangian multiplier method for the open pit mines long-term production scheduling problem optimization
    E. Moosavi
    J. Gholamnejad
    M. Ataee-pour
    E. Khorram
    [J]. Journal of Mining Science, 2014, 50 : 1047 - 1060
  • [2] Improvement of Lagrangian relaxation performance for open pit mines constrained long-term production scheduling problem
    E. Moosavi
    J. Gholamnejad
    M. Ataee-pour
    E. Khorram
    [J]. Journal of Central South University, 2014, 21 : 2848 - 2856
  • [3] Improvement of Lagrangian relaxation performance for open pit mines constrained long-term production scheduling problem
    E.Moosavi
    J.Gholamnejad
    M.Ataee-pour
    E.Khorram
    [J]. Journal of Central South University, 2014, 21 (07) : 2848 - 2856
  • [4] Improvement of Lagrangian relaxation performance for open pit mines constrained long-term production scheduling problem
    Moosavi, E.
    Gholamnejad, J.
    Ataee-pour, M.
    Khorram, E.
    [J]. JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2014, 21 (07) : 2848 - 2856
  • [5] A practical, long-term production scheduling model in open pit mines using integer linear programming
    Gholamnejad, J.
    Lotfian, R.
    Kasmaeeyazdi, S.
    [J]. JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2020, 120 (12) : 665 - 670
  • [6] Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation
    Ramazan, S.
    Dimitrakopoulos, R.
    [J]. OREBODY MODELLING AND STRATEGIC MINE PLANNING: UNCERTAINTY AND RISK MANAGEMENT MODELS, 2005, (14): : 359 - 365
  • [7] Long term production planning of open pit mines by ant colony optimization
    Shishvan, Masoud Soleymani
    Sattarvand, Javad
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (03) : 825 - 836
  • [8] LONG TERM PRODUCTION SCHEDULING OF OPEN PIT MINES, A REVIEW OF OLD AND NEW ALGORITHMS
    Hosseini, Seyed Mohammad Ali
    Kakaie, Reza
    Ataei, Mohammad
    [J]. SGEM 2008: 8TH INTERNATIONAL SCIENTIFIC CONFERENCE, VOL I, CONFERENCE PROCEEDINGS: MODERN MANAGEMENT OF MINE PRODUCING GEOLOGY AND ENVIRONMENTAL PROTECTION, 2008, : 477 - 485
  • [9] Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging
    E. Moosavi
    J. Gholamnejad
    [J]. Journal of Mining Science, 2015, 51 : 1226 - 1234
  • [10] Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging
    Moosavi, E.
    Gholamnejad, J.
    [J]. JOURNAL OF MINING SCIENCE, 2015, 51 (06) : 1226 - 1234