Optimal placement of heterogeneous distributed generators in a grid-connected multi-energy microgrid under uncertainties

被引:31
|
作者
Li, Zhengmao [1 ]
Xu, Yan [1 ]
Fang, Sidun [1 ]
Mazzoni, Stefano [2 ]
机构
[1] Nanyang Technol Univ, Sch Elect & Elect Engn, 50 Nanyang Ave, Singapore, Singapore
[2] Nanyang Technol Univ, Energy Res Inst, 50 Nanyang Ave, Singapore, Singapore
基金
新加坡国家研究基金会;
关键词
renewable energy sources; investment; optimisation; power distribution economics; power grids; power generation reliability; power generation economics; distributed power generation; wind turbines; investment year; project net present value; investment costs; operation costs; two-stage coordinated stochastic optimisation model; long-term DG investment; test MEMG system; conventional DG placement approaches; RES uncertainties; heterogeneous energies; optimal placement; heterogeneous distributed generators; grid-connected multienergy microgrid; diesel generators; power plants; proper placement; system energy efficiency; network reliability performance; two-stage coordinated method; heterogeneous DGs; MEMG project; RENEWABLE ENERGY; OPTIMIZATION; POWER; MANAGEMENT; SYSTEMS; DESIGN;
D O I
10.1049/iet-rpg.2019.0036
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The multi-energy microgrid (MEMG) comprises heterogeneous distributed generators (DGs) such as wind turbines, diesel generators, combined cooling, heat and power plants etc. Proper placement of these DGs is critical for the system energy efficiency and network reliability performance. This study proposes a two-stage coordinated method for optimally placing heterogeneous DGs in an MEMG project considering the uncertainties from renewable energy sources (RESs). Apart from optimising the traditional DG size and location, this method considers the optimal DG type and investment year simultaneously by maximising the project net present value (NPV), which consists of investment costs and operation costs. The whole problem is modelled as a two-stage coordinated stochastic optimisation model, where the long-term DG investment is determined at the first stage and operation decisions are determined at the second stage. The proposed method is verified on a test MEMG system. The simulation results show that its NPV is positive, which means the method is effective and should be implemented. Compared with the conventional DG placement approaches, the proposed method is more robust against the RES uncertainties and can better coordinate the heterogeneous energies with higher dispatch flexibility and economic profits.
引用
收藏
页码:2623 / 2633
页数:11
相关论文
共 50 条
  • [31] A Hierarchical Energy Management Strategy for Grid-connected Microgrid
    Li, Xingpeng
    Geng, Guangchao
    Jiang, Quanyuan
    2014 IEEE PES GENERAL MEETING - CONFERENCE & EXPOSITION, 2014,
  • [32] Optimal Energy for Grid-Connected Microgrid with Battery Swapping Station and Wind Photovoltaic and Energy Storage
    Song, Jiaoru
    Suo, Lian
    PROCEEDINGS OF 2019 IEEE 3RD INTERNATIONAL ELECTRICAL AND ENERGY CONFERENCE (CIEEC), 2019, : 1469 - 1473
  • [33] Distributed Power Sharing Control of The Grid-connected AC Microgrid
    Tang, Qing
    Bai, Handong
    Jiang, Huidi
    IFAC PAPERSONLINE, 2019, 52 (24): : 283 - 289
  • [34] Multi-energy microgrid optimal operation with integrated power to gas technology considering uncertainties
    Mobasseri, Ali
    Tostado-Veliz, Marcos
    Ghadimi, Ali Asghar
    Miveh, Mohammad Reza
    Jurado, Francisco
    JOURNAL OF CLEANER PRODUCTION, 2022, 333
  • [35] Multi-Objective Optimal Scheduling Method for a Grid-Connected Redundant Residential Microgrid
    Liu, Weiliang
    Liu, Changliang
    Lin, Yongjun
    Bai, Kang
    Ma, Liangyu
    Chen, Wenying
    PROCESSES, 2019, 7 (05)
  • [36] Optimal Configuration of Hybrid Solar-Wind Distributed Generation Capacity in a Grid-Connected Microgrid
    Liu, Shujun
    Wu, Zaijun
    Dou, Xiaobo
    Zhao, Bo
    Zhao, Shanglin
    Sun, Chunjun
    2013 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES (ISGT), 2013,
  • [37] Optimal Energy Storage Capacity and Power Transfer Limit Planning for Grid-connected Microgrid
    Wu, Yuxiang
    Tang, Ye
    Zhai, Qiaozhu
    Wu, Jiang
    2020 CHINESE AUTOMATION CONGRESS (CAC 2020), 2020, : 101 - 106
  • [38] Day-Ahead Optimal Scheduling for Grid-Connected Microgrid with Energy Storage Systems
    Mostafa, Mostafa H.
    Aleem, Shady H. E. Abdel
    Ali, Samia Gharib
    Abdelaziz, Almoataz Y.
    2019 21ST INTERNATIONAL MIDDLE EAST POWER SYSTEMS CONFERENCE (MEPCON 2019), 2019, : 828 - 833
  • [39] Advanced Control Techniques for Grid-Connected Distributed Generators in Microgrids
    Ma, Tsao-Tsung
    INTERNATIONAL REVIEW OF ELECTRICAL ENGINEERING-IREE, 2010, 5 (06): : 2764 - 2772
  • [40] Distributed Generators Optimal Sizing and Placement in A Microgrid Using PSO
    Tooryan, F.
    Collins, E. Randolph
    Ahmadi, A.
    Rangarajan, Shriram S.
    2017 IEEE 6TH INTERNATIONAL CONFERENCE ON RENEWABLE ENERGY RESEARCH AND APPLICATIONS (ICRERA), 2017, : 614 - 619