Sediment transport below a small alpine reservoir desilted by controlled flushing: field assessment and one-dimensional numerical simulation
被引:20
|
作者:
Brignoli, Maria Laura
论文数: 0引用数: 0
h-index: 0
机构:
Univ Insubria, Dept Sci & High Technol, Via GB Vico 46, I-21100 Varese, ItalyUniv Insubria, Dept Sci & High Technol, Via GB Vico 46, I-21100 Varese, Italy
Brignoli, Maria Laura
[1
]
Espa, Paolo
论文数: 0引用数: 0
h-index: 0
机构:
Univ Insubria, Dept Sci & High Technol, Via GB Vico 46, I-21100 Varese, ItalyUniv Insubria, Dept Sci & High Technol, Via GB Vico 46, I-21100 Varese, Italy
Espa, Paolo
[1
]
Batalla, Ramon J.
论文数: 0引用数: 0
h-index: 0
机构:
Univ Lleida, Dept Environm & Soil Sci, Lleida 25198, Catalonia, Spain
Univ Austral Chile, Fac Forest Sci & Nat Resources, Valdivia 5110566, ChileUniv Insubria, Dept Sci & High Technol, Via GB Vico 46, I-21100 Varese, Italy
Batalla, Ramon J.
[2
,3
]
机构:
[1] Univ Insubria, Dept Sci & High Technol, Via GB Vico 46, I-21100 Varese, Italy
Purpose Sediment transport and riverbed sedimentation were investigated in an alpine stream below a small hydropower reservoir desilted by a controlled sediment flushing (CSF) operation. The term "controlled" refers to the operational tasks implemented to mitigate the downstream environmental impact of the operation. The experimental dataset acquired before, during, and after the CSF was also used to carry out and calibrate a one-dimensional sediment transport model of the monitored event. Materials and methods The investigated reservoir is located in the central Italian Alps, and its original storage was 160,000 m(3), about 30% filled by a mixture of sand and silt/clay before the CSF. Downstream sediment concentration was controlled by releasing clear water from upstream reservoirs and regulating the work of earth-moving equipment in the emptied reservoir. A 3.6-km-long reach with average slope of 0.015 was monitored: concentration and grain size of suspended sediment were measured during the CSF and the riverbed alteration was evaluated by volumetric sampling and measurements of the deposits' thickness. Sedimentation and River Hydraulics-One Dimensional (SRH-1D) was used to simulate sediment transport during the monitored CSF. Model parameters were calibrated by comparing the computed and the observed amount of sediment deposited along the study reach. Results and discussion Sediment flushing was carried out in October 2010 for 3 days. Ca. 16,000 m(3) of sediment were evacuated, representing approximately 30% silt/clay and 70% sand. 2.4 Mm(3) of clear water was released to reduce sediment concentration and increase transport capacity downstream. About 3000 m(3) of sand was deposited in the study reach after the CSF, with maximum height up to 0.2 m. Although the riverbed before the CSF was simply set as mono-granular, after calibrating the parameters, good agreement was achieved between the depositional pattern computed by SRH-1D and the one observed, both in terms of deposit thickness and grain size of deposited sediment. The sensitivity analysis revealed a major role of the parameters controlling bed mixing processes in affecting the simulated deposition after the CSF. Conclusions Sediment below 0.1 mm in diameter was not detected in river deposits after the flushing: the effects on river biota associated with substrate clogging by very fine sediment were therefore minimized. After proper calibration, 1-D sediment transport modeling can effectively support the planning of CSF operations: to minimize the downstream environmental effects, concurrently achieving acceptable flushing efficiency, the analyzed scenarios as well as the model outputs need to be carefully evaluated from a multidisciplinary perspective.
机构:
Department of Civil and Environmental Engineering,Faculty of Engineering,National University of SingaporeDepartment of River Engineering and Disaster Management,Faculty of Hydrology and Water Resources,Thuyloi University