Human capacity building strategies for improving PPP implementation in Tanzanian construction projects

被引:2
|
作者
Chileshe, Nicholas [1 ,2 ]
Kavishe, Neema [3 ]
机构
[1] Univ South Australia, Sustainable Infrastruct & Resource Management, UniSA STEM, Adelaide, SA, Australia
[2] Univ Johannesburg, Fac Engn & Built Environm, Johannesburg, South Africa
[3] Ardhi Univ, Sch Architecture Construct Econ & Management SACE, Dar Es Salaam, Tanzania
关键词
Developing countries; Tanzania; Human capacity building; Strategies; Public-private partnership (PPP); PRIVATE PARTNERSHIP; INFRASTRUCTURE; POLICY;
D O I
10.1108/BEPAM-08-2021-0110
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose Implementation of public-private partnerships (PPPs) in African projects is inundated with a number of capacity building challenges which affects growth and project performance. Further, there is paucity of empirical studies on the strategies for overcoming these challenges. Therefore, this research addresses that knowledge gap by examining the human capacity building (HCB) strategies for improving PPP implementation in construction projects in developing countries, with a focus on Tanzania. Design/methodology/approach HCB strategies identified from the scoping review were administered to 81 handpicked Tanzanian practitioners attending PPP training course. To examine the differences in the perception of the identified HCB strategies, and the relationships between different pairs of the HCB strategies, the data were subjected descriptive statistics, parametric tests, Kendall's concordance and Pearson correlational analysis, including group wise correlation analysis. Findings Based on the overall sample, "Engagement of stakeholders on capacity development", "Organization of PPP seminars and training" and "Introduction of in-house training to Public institutions expected to undertake PPP projects" are the top ranked HCB strategies. "Development of study tours to stakeholders involved in PPP projects" is the least ranked. Significant differences between the sub-groups of "no PPP experience" and "some PPP experience" were evident for "Invitation of International experts to share experiences" and "Sharing of responsibilities" HCB strategies. The "no PPP experience" group rated both strategies higher than those with "some PPP experience". Practical implications The identified HCB strategies can be used as a "road map" for the development of appropriate engagement strategies with various stakeholders for the successful implementation of PPP thereby, enhancing the performance of the construction firms. Originality/value Eight strategies have been identified from the literature and tested for the Tanzanian context. The uniqueness of Tanzanian PPP implementation context arising from varying cultural, organizational, political and economic conditions differentiates the priority of HCB strategies when compared to other contexts where these strategies were investigated. This is germane to the PPP research.
引用
收藏
页码:906 / 923
页数:18
相关论文
共 50 条
  • [41] Role of Management Strategies in Improving Labor Productivity in General Construction Projects in New Zealand: Managerial Perspective
    Ghodrati, Nariman
    Yiu, Tak Wing
    Wilkinson, Suzanne
    Shahbazpour, Mehdi
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (06)
  • [42] Factors and Strategies for Improving Construction Management on Sites in Mega-Projects in South Africa: An Explorative Survey
    Aiyetan, Ayodeji Olatunji
    Das, Dillip Kumar
    INFRASTRUCTURES, 2022, 7 (02)
  • [43] An empirical analysis of barriers to building information modelling (BIM) implementation in construction projects: evidence from the Chinese context
    Ma, Xiaozhi
    Darko, Amos
    Chan, Albert P. C.
    Wang, Rong
    Zhang, Boyu
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (16) : 3119 - 3127
  • [44] An Ecological Study on Enhancing the Malaysian Construction Ecosystem: Readiness Implementation Factors in Industrialised Building System (IBS) Projects
    Nawi, Mohd Nasrun Mohd
    Noordin, Alminnourliza
    Tamrin, Norhidayah
    Nifa, Faizatul Akmar Abdul
    Lin, Chong Khai
    EKOLOJI, 2019, 28 (107): : 545 - 552
  • [45] Barriers to implementation of energy-efficient technologies in building construction projects - Results from a Swedish case study
    Carlander, Jakob
    Thollander, Patrik
    RESOURCES ENVIRONMENT AND SUSTAINABILITY, 2023, 11
  • [46] Drivers for implementation of energy-efficient technologies in building construction projects - Results from a Swedish case study
    Carlander, Jakob
    Thollander, Patrik
    RESOURCES ENVIRONMENT AND SUSTAINABILITY, 2022, 10
  • [47] Deploying Bottleneck Management Strategies for Ameliorating Critical Delays in Building Construction Projects: A Case for Developing Country of Iran
    Karimi, Hamidreza
    Sarvari, Hadi
    Edwards, David J.
    Chan, Daniel W. M.
    Olawumi, Timothy O.
    SYSTEMS, 2024, 12 (06):
  • [48] Revolutionizing construction: A cutting-edge decision-making model for artificial intelligence implementation in sustainable building projects
    Kineber, Ahmed Farouk
    Elshaboury, Nehal
    Oke, Ayodeji Emmanuel
    Aliu, John
    Abunada, Ziyad
    Alhusban, Mohammad
    HELIYON, 2024, 10 (17)
  • [49] An Empirical Analysis of Barriers to Building Information Modelling (BIM) Implementation in Wood Construction Projects: Evidence from the Swedish Context
    Gharaibeh, Lina
    Matarneh, Sandra T.
    Eriksson, Kristina
    Lantz, Bjorn
    BUILDINGS, 2022, 12 (08)
  • [50] Strategies for Improving the Effectiveness of Party Building Informatization Construction in Higher Vocational Colleges and Universities Driven by Big Data
    Li, Ping
    Chen, Xiuli
    Applied Mathematics and Nonlinear Sciences, 2024, 9 (01)