Human capacity building strategies for improving PPP implementation in Tanzanian construction projects

被引:2
|
作者
Chileshe, Nicholas [1 ,2 ]
Kavishe, Neema [3 ]
机构
[1] Univ South Australia, Sustainable Infrastruct & Resource Management, UniSA STEM, Adelaide, SA, Australia
[2] Univ Johannesburg, Fac Engn & Built Environm, Johannesburg, South Africa
[3] Ardhi Univ, Sch Architecture Construct Econ & Management SACE, Dar Es Salaam, Tanzania
关键词
Developing countries; Tanzania; Human capacity building; Strategies; Public-private partnership (PPP); PRIVATE PARTNERSHIP; INFRASTRUCTURE; POLICY;
D O I
10.1108/BEPAM-08-2021-0110
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose Implementation of public-private partnerships (PPPs) in African projects is inundated with a number of capacity building challenges which affects growth and project performance. Further, there is paucity of empirical studies on the strategies for overcoming these challenges. Therefore, this research addresses that knowledge gap by examining the human capacity building (HCB) strategies for improving PPP implementation in construction projects in developing countries, with a focus on Tanzania. Design/methodology/approach HCB strategies identified from the scoping review were administered to 81 handpicked Tanzanian practitioners attending PPP training course. To examine the differences in the perception of the identified HCB strategies, and the relationships between different pairs of the HCB strategies, the data were subjected descriptive statistics, parametric tests, Kendall's concordance and Pearson correlational analysis, including group wise correlation analysis. Findings Based on the overall sample, "Engagement of stakeholders on capacity development", "Organization of PPP seminars and training" and "Introduction of in-house training to Public institutions expected to undertake PPP projects" are the top ranked HCB strategies. "Development of study tours to stakeholders involved in PPP projects" is the least ranked. Significant differences between the sub-groups of "no PPP experience" and "some PPP experience" were evident for "Invitation of International experts to share experiences" and "Sharing of responsibilities" HCB strategies. The "no PPP experience" group rated both strategies higher than those with "some PPP experience". Practical implications The identified HCB strategies can be used as a "road map" for the development of appropriate engagement strategies with various stakeholders for the successful implementation of PPP thereby, enhancing the performance of the construction firms. Originality/value Eight strategies have been identified from the literature and tested for the Tanzanian context. The uniqueness of Tanzanian PPP implementation context arising from varying cultural, organizational, political and economic conditions differentiates the priority of HCB strategies when compared to other contexts where these strategies were investigated. This is germane to the PPP research.
引用
收藏
页码:906 / 923
页数:18
相关论文
共 50 条
  • [1] Key barriers to the implementation of energy-management strategies in building construction projects
    Enshassi, Adnan
    Ayash, Abed
    Mohamed, Sherif
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2018, 36 (01) : 15 - 40
  • [2] Implementation of Building Information Modelling in infrastructure construction projects: a study of dimensions and strategies
    Ershadi, Mahmoud
    Davis, Peter
    Jefferies, Marcus
    Mojtahedi, Mohammad
    IJISPM-INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND PROJECT MANAGEMENT, 2021, 9 (04): : 43 - 59
  • [3] A protocol for building mental health implementation capacity for Malawian and Tanzanian researchers and policymakers
    Akiba, Christopher
    Go, Vivian
    Mwapasa, Victor
    Hosseinipour, Mina
    Gaynes, Brad
    Amberbir, Alemayehu
    Udedi, Michael
    Pence, Brian
    IMPLEMENTATION SCIENCE, 2020, 15
  • [4] Building Diagnosis and Decision Criteria for Replacement Construction Implementation of Construction Projects in Seelow
    Zink, Ulrich
    MAUERWERK, 2005, 9 (05) : 176 - 178
  • [5] PPP-projects: Structural cost comparison between self-contained implementation of building projects by public clients and PPP providers
    Blecken, Udo
    Gralla, Mike
    Holthaus, Ursula
    BAUTECHNIK, 2007, 84 (01) : 25 - 34
  • [6] Stakeholders' influence strategies on social responsibility implementation in construction projects
    Lin, Xue
    McKenna, Bernard
    Ho, Christabel M. F.
    Shen, Geoffrey Q. P.
    JOURNAL OF CLEANER PRODUCTION, 2019, 235 : 348 - 358
  • [7] Strategies for Improving Codes of Ethics Implementation in Construction Organizations
    Oladinrin, T. Olugbenga
    Ho, Christabel Man-Fong
    PROJECT MANAGEMENT JOURNAL, 2014, 45 (05) : 15 - 26
  • [8] Construction Equipment Management Practices for Improving Labor Productivity in Multistory Building Construction Projects
    Gurmu, Argaw Tarekegn
    Aibinu, Ajibade Ayodeji
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (10)
  • [9] Challenges to the Implementation of Building Information Modeling (BIM) for Sustainable Construction Projects
    Kineber, Ahmed Farouk
    Othman, Idris
    Famakin, Ibukun O. O.
    Oke, Ayodeji Emmanuel
    Hamed, Mohammed Magdy
    Olayemi, Taiwo Matthew
    APPLIED SCIENCES-BASEL, 2023, 13 (06):
  • [10] Sustainable Construction Practices: Challenges of Implementation in Building Infrastructure Projects in Malawi
    Malik, Abubakari
    Mbewe, Peter B. K.
    Kavishe, Neema
    Mkandawire, Theresa
    BUILDINGS, 2025, 15 (04)