Responses of channel morphology to flow-sediment variations after dam construction: a case study of the Shashi Reach, middle Yangtze River

被引:12
|
作者
Chen, Fan [1 ]
Chen, Li [1 ]
Zhang, Wei [1 ]
Han, Jiandiao [2 ]
Wang, Junzhou [1 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Hubei, Peoples R China
[2] Northwest A&F Univ, Inst Soil & Water Conservat, Yangling, Shanxi, Peoples R China
来源
HYDROLOGY RESEARCH | 2019年 / 50卷 / 05期
基金
中国国家自然科学基金;
关键词
channel morphological adjustments; flow-sediment processes; sediment supply regime; Three Gorges Dam; 3 GORGES DAM; EFFECTIVE DISCHARGE; SEASONAL-VARIATIONS; JINGJIANG REACH; MOUNTAIN RIVER; DOWNSTREAM; IMPACTS; TRANSPORT; ADJUSTMENTS; RESERVOIR;
D O I
10.2166/nh.2019.066
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Upstream damming has profoundly impacted downstream channel morphology by altering inflowing water and sediment conditions, which can mostly be ascribed to variations in the flow hydrograph and sediment supply regime. In this paper, channel erosion and deposition during different flow-sediment processes are quantified using a 2D hydro-morphodynamic model. Our results revealed that the net erosion mainly occurred during the flood season when the flow discharges were above 15,000 m(3)/s. Together, larger peak discharges and less sediment supply could produce greater net erosion. Flow hydrograph variations could alter the inundation extent, thus creating a more widespread redistribution of channel deposition and erosion and possibly causing a shift in the active channel adjustment area, where more channel scouring and siltation occurred. The channel adjustments caused by the sediment supply regime variations underwent a gradual downward propagation process, and most of the riverbed thalweg profile variations could first be observed at a very short distance from the studied reach entrance. A larger cross-sectional area and channel depth as well as a lower width-depth ratio could result from larger floods and less incoming upstream sediment load. We found that a comprehensive flow-sediment combination coefficient with a value of m ranging from 2 to 4 most appropriately reflected the post-dam flow-sediment imbalance regime at the studied reach, which implied the leading role of flow hydrograph variations in shaping channel morphology. In summary, the combined results presented herein for the Shashi Reach of the Yangtze River can provide a better understanding of the downstream morphological impacts of different flow-sediment processes caused by dam operation.
引用
收藏
页码:1359 / 1375
页数:17
相关论文
共 50 条
  • [21] Bridge construction and river channel morphology—A comprehensive study of flow behavior and sediment size alteration of the River Chel, India
    Mery Biswas
    Puja Banerjee
    Arabian Journal of Geosciences, 2018, 11
  • [22] Regional climate change after the commissioning of the Three Gorges Dam: a case study for the middle reaches of the Yangtze River
    Ge, Feifan
    Mao, Kebiao
    Jiang, Yuelin
    Wang, Lei
    Xu, Tongren
    Gao, Chunyu
    Zuo, Zhiyuan
    CLIMATE RESEARCH, 2018, 75 (01) : 33 - 51
  • [23] Dam Impacts on Seasonality of Water and Sediment Transport in Intensively Managed River Basins: A Case Study of the Yangtze River
    Tian, Q.
    Xu, K. H.
    Wang, Y. P.
    Liang, C. J.
    JOURNAL OF GEOPHYSICAL RESEARCH-EARTH SURFACE, 2022, 127 (11)
  • [24] STUDY OF CHANNEL DEVELOPMENT AFTER COMPLETION OF ARTIFICIAL CUTOFFS IN MIDDLE YANGTZE RIVER
    PAN, CS
    SHIH, SC
    TUAN, WC
    SCIENTIA SINICA, 1978, 21 (06): : 783 - 804
  • [25] A STUDY OF THE CHANNEL DEVELOPMENT AFTER THE COMPLETION OF ARTIFICIAL CUTOFFS IN THE MIDDLE YANGTZE RIVER
    潘庆燊
    史绍权
    段文忠
    ScienceinChina,SerA., 1978, Ser.A.1978 (06) : 783 - 804
  • [26] Bridge construction and river channel morphology-A comprehensive study of flow behavior and sediment size alteration of the River Chel, India
    Biswas, Mery
    Banerjee, Puja
    ARABIAN JOURNAL OF GEOSCIENCES, 2018, 11 (16)
  • [27] A STUDY OF THE CHANNEL DEVELOPMENT AFTER THE COMPLETION OF ARTIFICIAL CUTOFFS IN THE MIDDLE YANGTZE RIVER
    潘庆燊
    史绍权
    段文忠
    Science China Mathematics, 1978, (06) : 783 - 804
  • [28] Flow resistance adjustments of channel and bars in the middle reaches of the Yangtze River in response to the operation of the Three Gorges Dam
    HU Yong
    DENG Jinyun
    LI Yitian
    LIU Congcong
    HE Zican
    Journal of Geographical Sciences, 2022, 32 (10) : 2013 - 2035
  • [29] Flow resistance adjustments of channel and bars in the middle reaches of the Yangtze River in response to the operation of the Three Gorges Dam
    Hu Yong
    Deng Jinyun
    Li Yitian
    Liu Congcong
    He Zican
    JOURNAL OF GEOGRAPHICAL SCIENCES, 2022, 32 (10) : 2013 - 2035
  • [30] Flow resistance adjustments of channel and bars in the middle reaches of the Yangtze River in response to the operation of the Three Gorges Dam
    Yong Hu
    Jinyun Deng
    Yitian Li
    Congcong Liu
    Zican He
    Journal of Geographical Sciences, 2022, 32 : 2013 - 2035