Developing a Cost Minimizing Power Load Prediction Model for Steelwork Industries

被引:1
|
作者
Ryu, Jun-hyung [1 ]
Yoo, Dong Joon [1 ]
Lee, In-Beum [1 ]
机构
[1] Dongguk Univ, Dept Energy & Environm Syst, Gyeongju 780814, South Korea
关键词
D O I
10.1021/ie900227e
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The key issue of power systems is to match power demand and supply with the minimum gap and delay. In the steelmaking industry that is well-known for intensive power demand, multiple types of power supply sources are thus prepared. One is to use gas turbine generators consuming byproduct gases, another is to purchase power from external electricity companies, and yet another is to use in-house self-generators to prevent any interruptions. Because we have to prepare the power supply before demands are actually realized, the fuels for generators should be purchased based upon a relatively long-term plan. and redundant power should be consumed by being resold or in other ways. It is economically important to predict power load accurately for the profitability of the steelworks. A load prediction model is therefore mathematically formulated as a linear programming (LP) problem with a view to minimizing Me overall power cost. A case of an actual steelmaking company in Korea is addressed to illustrate the applicability of the proposed model with some remarks.
引用
收藏
页码:3952 / 3956
页数:5
相关论文
共 50 条
  • [21] Grey Prediction Model of Power load based on Exponential Smoothing Improvement
    Wu, Di
    GREEN ENERGY AND SUSTAINABLE DEVELOPMENT I, 2017, 1864
  • [22] A Neural Prediction Model to Predict Power Load Involving Weather Element
    Li, XinLei
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON MACHINERY, ELECTRONICS AND CONTROL SIMULATION (MECS 2017), 2017, 138 : 455 - 458
  • [23] A MODEL OF TECHNOLOGY SELECTION BY COST MINIMIZING PRODUCERS
    BOYD, DW
    PHILLIPS, RL
    REGULINSKI, SG
    MANAGEMENT SCIENCE, 1982, 28 (04) : 418 - 424
  • [24] Approach to minimizing the fuzzy load not supplied in electric power planning
    Zhang, Yan
    Chen, Zhangchao
    Li, Yongteng
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 1999, 33 (04): : 492 - 494
  • [25] Robust Estimation Model of Wind Power Prediction Availability in the Period of Power System Peak Load
    Ge W.
    Sun P.
    Li J.
    Hui Q.
    Kong X.
    Gaodianya Jishu/High Voltage Engineering, 2019, 45 (04): : 1281 - 1288
  • [26] IPSO-BP Hybrid Prediction Model and Its Application in Power Load
    Shao, Yuxiang
    Xu, Hongwen
    2009 2ND IEEE INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND INFORMATION TECHNOLOGY, VOL 4, 2009, : 303 - +
  • [27] Load noise prediction of a power transformer
    Lee, Booyeong
    Lee, Kyuho
    Park, Chuljun
    Ryu, Seokwon
    Chung, Jintai
    JOURNAL OF VIBRATION AND CONTROL, 2022, 28 (23-24) : 3719 - 3727
  • [28] Prediction of critical load levels for AC optimal power flow dispatch model
    Bo, Rui
    Li, Fangxing
    Tomsovic, Kevin
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2012, 42 (01) : 635 - 643
  • [29] Greedy Algorithm for Minimizing the Cost of Routing Power on a Digital Microgrid
    Jiang, Zhengqi
    Sahasrabudhe, Vinit
    Mohamed, Ahmed
    Grebel, Haim
    Rojas-Cessa, Roberto
    ENERGIES, 2019, 12 (16)
  • [30] Minimizing power cost in QoS constrained wireless sensor networks
    Shi L.
    Fapojuwo A.O.
    Shi, L. (lshi@sandvine.com), 1600, Springer Science and Business Media, LLC (20): : 13 - 26