Developing a Cost Minimizing Power Load Prediction Model for Steelwork Industries

被引:1
|
作者
Ryu, Jun-hyung [1 ]
Yoo, Dong Joon [1 ]
Lee, In-Beum [1 ]
机构
[1] Dongguk Univ, Dept Energy & Environm Syst, Gyeongju 780814, South Korea
关键词
D O I
10.1021/ie900227e
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The key issue of power systems is to match power demand and supply with the minimum gap and delay. In the steelmaking industry that is well-known for intensive power demand, multiple types of power supply sources are thus prepared. One is to use gas turbine generators consuming byproduct gases, another is to purchase power from external electricity companies, and yet another is to use in-house self-generators to prevent any interruptions. Because we have to prepare the power supply before demands are actually realized, the fuels for generators should be purchased based upon a relatively long-term plan. and redundant power should be consumed by being resold or in other ways. It is economically important to predict power load accurately for the profitability of the steelworks. A load prediction model is therefore mathematically formulated as a linear programming (LP) problem with a view to minimizing Me overall power cost. A case of an actual steelmaking company in Korea is addressed to illustrate the applicability of the proposed model with some remarks.
引用
收藏
页码:3952 / 3956
页数:5
相关论文
共 50 条
  • [1] Load shedding model and algorithm based on minimizing power outage cost of multi-intervals
    School of Electrical Engineering and Automation, Harbin Institute of Technology, Harbin 150001, China
    不详
    Harbin Gongye Daxue Xuebao, 2008, 1 (95-99):
  • [2] Power Planning Model of Microgrid based on minimizing the LCC cost
    Zhang Hao
    Tian Shaoyu
    Liu ZhongJing
    Chen Fang
    RENEWABLE ENERGY AND ENVIRONMENTAL TECHNOLOGY, PTS 1-6, 2014, 448-453 : 2687 - 2694
  • [3] A model of market power in electricity industries subject to peak load pricing
    Arellano, Maria-Soledad
    Serra, Pablo
    ENERGY POLICY, 2007, 35 (10) : 5130 - 5135
  • [4] Minimizing the load redistribution cost in cluster architectures
    Pardines, I
    Rivera, FF
    12TH EUROMICRO CONFERENCE ON PARALLEL, DISTRIBUTED AND NETWORK-BASED PROCESSING, PROCEEDINGS, 2004, : 326 - 331
  • [5] Analysis of Power Planning Model Based on Minimizing the Initial Investment Cost
    Liu, ZhongJing
    Fu, Tingting
    Yu, Xudong
    Ma, Junzhou
    Dong, Xuefeng
    Fang, Shuyan
    Wang, Shuangwen
    CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 3237 - 3244
  • [6] Analysis of Power Planning Model Based on Minimizing the Operation and Maintenance Cost
    Hong Yuan
    Tian Shaoyu
    Liu ZhongJing
    Chenfang
    RENEWABLE ENERGY AND ENVIRONMENTAL TECHNOLOGY, PTS 1-6, 2014, 448-453 : 2681 - 2686
  • [7] Hidden markov model prediction algorithm for power load
    Li, Hanju (99959828@qq.com), 2018, SHPMedia Sdn Bhd
  • [8] CASCARO: Cascade of classifiers for minimizing the cost of prediction
    Hanczar, Blaise
    Bar-Hen, Avner
    Pattern Recognition Letters, 2021, 149 : 37 - 43
  • [9] CASCARO: Cascade of classifiers for minimizing the cost of prediction
    Hanczar, Blaise
    Bar-Hen, Avner
    PATTERN RECOGNITION LETTERS, 2021, 149 : 37 - 43
  • [10] Application of improved grey prediction model for power load forecasting
    Li, Wei
    Han, Zhu-hua
    PROCEEDINGS OF THE 2008 12TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, VOLS I AND II, 2008, : 1116 - 1121