Long-term rail profile damage in a railway crossing: Field measurements and numerical simulations

被引:21
|
作者
Skrypnyk, Rostyslav [1 ]
Ossberger, Uwe [2 ]
Palsson, Bjoern A. [1 ]
Ekh, Magnus [3 ]
Nielsen, Jens C. O. [1 ]
机构
[1] Chalmers Univ Technol, Dept Mech & Maritime Sci CHARMEC, SE-41296 Gothenburg, Sweden
[2] Voestalpine VAE GmbH, Zeltweg, Austria
[3] Chalmers Univ Technol, Dept Ind & Mat Sci CHARMEC, SE-41296 Gothenburg, Sweden
基金
欧盟地平线“2020”;
关键词
Dynamicvehicle-track interaction; Switches & crossings; S&C; FEM; Plastic deformation; Wear; TRACK INTERACTION; WHEEL; CONTACT; WEAR; OPTIMIZATION; PREDICTION; SWITCHES; TRAIN;
D O I
10.1016/j.wear.2020.203331
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Railway crossings are subjected to a severe load environment leading to a degradation of rail profiles due to wear and accumulated plastic deformation. This damage is the result of the high magnitudes of contact pressure and traction generated in the wheel-rail contact during each wheel transition between wing rail and crossing nose. An extensive measurement campaign has been carried out at a test site in Austria in a particularly severely loaded crossing manufactured from an explosion depth hardened (EDH) manganese steel grade. For an accumulated traffic load of 65 Mega-Gross-Tonnes (MGT), the evolution of profile degradation for 16 cross-sections along the crossing rail has been recorded on multiple occasions. The results from the measurement campaign are used to validate a previously presented multidisciplinary and iterative simulation methodology for the prediction of long-term rail damage. It is shown that the predicted rail profile degradation exceeds the measured degradation for some of the cross-sections but generally a good qualitative agreement is observed. Possible reasons for the higher predicted damage are the uncertain distribution of traffic at the test site and differences in material properties between the crossing in the field and the test specimens used for calibration of the cyclic plasticity model. The influence of the frequency of updating the rail profiles in the iterative simulation methodology, and the compromise between computational cost and the number of load cases accounted for in the applied load sequence, are addressed.
引用
收藏
页数:13
相关论文
共 50 条
  • [21] Insights from geodynamo simulations into long-term geomagnetic field behaviour
    Davies, Christopher J.
    Constable, Catherine G.
    EARTH AND PLANETARY SCIENCE LETTERS, 2014, 404 : 238 - 249
  • [22] Damage detection of steel bridge by numerical simulations and measurements
    Svendsen, B. T.
    Froseth, G. T.
    Ronnquist, A.
    LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 237 - 243
  • [23] Crossing the midline: A long-term case report
    McCollum, AGH
    AMERICAN JOURNAL OF ORTHODONTICS AND DENTOFACIAL ORTHOPEDICS, 1999, 115 (05) : 559 - 562
  • [24] Numerical analysis of long-term variability of AGN jets through RMHD simulations
    Acharya, Sriyasriti
    Borse, Nikhil S.
    Vaidya, Bhargav
    MONTHLY NOTICES OF THE ROYAL ASTRONOMICAL SOCIETY, 2021, 506 (02) : 1862 - 1878
  • [25] LONG-TERM RAIL CONTRACTS - HANDLE WITH CARE
    BORTS, GH
    TRANSPORTATION JOURNAL, 1986, 25 (03) : 4 - 11
  • [26] Field measurements and numerical investigation on heat transfer characteristics and long-term performance of deep borehole heat exchangers
    Chen, Hongfei
    Liu, Hongtao
    Yang, Fuxin
    Tan, Houzhang
    Wang, Bangju
    RENEWABLE ENERGY, 2023, 205 : 1125 - 1136
  • [27] Circulation and railway installations: Long-term verification
    Circolazione e gli impianti ferroviari. La verifica a lungo termine
    Corazza, Giuseppe Romolo, 1600, (46):
  • [28] Evolution of Rail Contact Fatigue on Crossing Nose Rail Based on Long Short-Term Memory
    Kou, Lei
    Sysyn, Mykola
    Liu, Jianxing
    Nabochenko, Olga
    Han, Yue
    Peng, Dai
    Fischer, Szabolcs
    SUSTAINABILITY, 2022, 14 (24)
  • [29] LONG-TERM STABILITY OF MEASUREMENTS IN THE CO-60 FIELD AT THE BIPM
    PERROCHE, AM
    BOUTILLON, M
    METROLOGIA, 1995, 32 (01) : 43 - 50
  • [30] Geothermal pavements: field observations, numerical modelling and long-term performance
    Gu, Xiaoying
    Makasis, Nikolas
    Motamedi, Yaser
    Narsilio, Guillermo A.
    Arulrajah, Arul
    Horpibulsuk, Suksun
    GEOTECHNIQUE, 2022, 72 (09): : 832 - 846