Resource-constrained project scheduling and timetabling

被引:0
|
作者
Brucker, P [1 ]
Knust, S [1 ]
机构
[1] Univ Osnabruck, FB Math Informat, D-49069 Osnabruck, Germany
关键词
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
引用
收藏
页码:277 / 293
页数:17
相关论文
共 50 条
  • [21] New strategies for stochastic resource-constrained project scheduling
    Salim Rostami
    Stefan Creemers
    Roel Leus
    [J]. Journal of Scheduling, 2018, 21 : 349 - 365
  • [22] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    [J]. Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [23] Multimode resource-constrained project scheduling in flexible projects
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    [J]. JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (01) : 211 - 241
  • [24] Network decomposition techniques for resource-constrained project scheduling
    Sprecher, A
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (04) : 405 - 414
  • [25] MILP Formulation for Resource-Constrained Project Scheduling Problems
    Kyriakidis, Thomas S.
    Kopanos, Georgios M.
    Georgiadis, Michael C.
    [J]. 21ST EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2011, 29 : 880 - 884
  • [26] A competitive genetic algorithm for resource-constrained project scheduling
    Hartmann, S
    [J]. NAVAL RESEARCH LOGISTICS, 1998, 45 (07) : 733 - 750
  • [27] Ant colony optimization for resource-constrained project scheduling
    Merkle, D
    Middendorf, M
    Schmeck, H
    [J]. IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (04) : 333 - 346
  • [28] Pre-emption in resource-constrained project scheduling
    Ballestin, Francisco
    Valls, Vicente
    Quintanilla, Sacramento
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) : 1136 - 1152
  • [29] The proactive and reactive resource-constrained project scheduling problem
    Morteza Davari
    Erik Demeulemeester
    [J]. Journal of Scheduling, 2019, 22 : 211 - 237
  • [30] Periodically aggregated resource-constrained project scheduling problem
    Morin, Pierre-Antoine
    Artigues, Christian
    Hait, Alain
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (06) : 792 - 817