A column generation-based heuristic for aircraft recovery problem with airport capacity constraints and maintenance flexibility

被引:77
|
作者
Liang, Zhe [1 ]
Xiao, Fan [1 ]
Qian, Xiongwen [1 ,2 ]
Zhou, Lei [1 ]
Jin, Xianfei [3 ]
Lu, Xuehua [3 ]
Karichery, Sureshan [3 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
[2] Nanyang Technol Univ, Sch Mech & Aerosp Engn, Singapore 639798, Singapore
[3] Sabre Airline Solut, 3150 Sabre Dr, Southlake, TX 76092 USA
基金
美国国家科学基金会;
关键词
Aircraft recovery problem; Disruptions management; Column generation; AIRLINE FLIGHT CANCELLATIONS; TIME DECISION-SUPPORT; SCHEDULE RECOVERY; HUB CLOSURES; ALGORITHM; DELAYS; PERTURBATION; INTEGRATION; OPERATIONS; MODELS;
D O I
10.1016/j.trb.2018.05.007
中图分类号
F [经济];
学科分类号
02 ;
摘要
We consider the aircraft recovery problem (ARP) with airport capacity constraints and maintenance flexibility. The problem is to re-schedule flights and re-assign aircraft in real time with minimized recovery cost for airlines after disruptions occur. In most published studies, airport capacity and flexible maintenance are not considered simultaneously via an optimization approach. To bridge this gap, we propose a column generation heuristic to solve the problem. The framework consists of a master problem for selecting routes for aircraft and subproblems for generating routes. Airport capacity is explicitly considered in the master problem and swappable planned maintenances can be incorporated in the subproblem. Instead of discrete delay models which are widely adopted in much of the existing literature, in this work flight delays are continuous and optimized accurately in the subproblems. The continuous-delay model can improve the accuracy of the optimized recovery cost by up to 37.74%. The computational study based on real-world problems shows that the master problem gives very tight linear relaxation with small, often zero, optimality gaps. Large-scale problems can be solved within 6 min and the run time can be further shortened by parallelizing subproblems on more powerful hardware. In addition, from a managerial point of view, computational experiments reveal that swapping planned maintenances may bring a considerable reduction in recovery cost by about 20% and 60%, depending on specific problem instances. Furthermore, the decreasing marginal value of airport slot quota is found by computational experiments. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:70 / 90
页数:21
相关论文
共 50 条
  • [21] Column generation based heuristic for a helicopter routing problem
    Moreno, Lorenza
    de Aragao, Marcus Poggi
    Uchoa, Eduardo
    EXPERIMENTAL ALGORITHMS, PROCEEDINGS, 2006, 4007 : 219 - 230
  • [22] Column Generation-based Heuristic Approach for Electric Bus and Driver Scheduling on Single Bus Lines
    Liu H.-X.
    Wu A.-F.
    Long J.-C.
    Zhou J.
    Long, Jian-Cheng (jianchenglong@hfut.edu.cn), 1600, Science Press (21): : 211 - 220
  • [23] A column generation-based approach for the adaptive stochastic blood donation tailoring problem
    Elyasi, Milad
    Ozener, Okan Orsan
    Yanikoglu, Ihsan
    Ekici, Ali
    Dolgui, Alexandre
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2025, 63 (02) : 703 - 728
  • [24] A Column Generation Based Heuristic for the Capacitated Vehicle Routing Problem with Three-dimensional Loading Constraints
    Mahvash, Batoul
    Awasthi, Anjali
    Chauhan, Satyaveer
    IFAC PAPERSONLINE, 2015, 48 (03): : 454 - 459
  • [25] A column generation based heuristic for the capacitated vehicle routing problem with three-dimensional loading constraints
    Mahvash, Batoul
    Awasthi, Anjali
    Chauhan, Satyaveer
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (06) : 1730 - 1747
  • [26] A Column Generation Based Heuristic for a Bus Driver Rostering Problem
    Barbosa, Vitor
    Respicio, Ana
    Alvelos, Filipe
    PROGRESS IN ARTIFICIAL INTELLIGENCE-BK, 2015, 9273 : 143 - 156
  • [27] An improved column generation algorithm for the disrupted flight recovery problem with discrete flight duration control and aircraft assignment constraints
    Li, Jie
    Li, Kunpeng
    Tian, Qiannan
    Kumar, P. N. Ram
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 174
  • [28] A Weight-Table Based Heuristic Algorithm for Aircraft Recovery Problem
    Zhao, Tong
    Chen, Xiong
    2018 37TH CHINESE CONTROL CONFERENCE (CCC), 2018, : 2242 - 2246
  • [29] The bundled task assignment problem in mobile crowdsensing: A column generation-based solution approach
    Amiri, Ali
    Barkhi, Reza
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 237
  • [30] A column generation-based algorithm for midterm nurse scheduling with specialized constraints, preference considerations, and overtime
    Guo, Jia
    Bard, Jonathan F.
    COMPUTERS & OPERATIONS RESEARCH, 2022, 138