EVALUATION OF RAILWAY LINE CAPACITY USING GENERAL PURPOSE SIMULATION TOOL

被引:0
|
作者
Marton, Peter [1 ]
机构
[1] Univ Zilina, Fac Management Sci & Informat, Dept Math Methods & Operat Res, Zilina, Slovakia
关键词
simulation tool; railway line capacity; automatic block;
D O I
暂无
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
A White paper of the European Commission (Roadmap to a Single European Transport Area - Towards a competitive and resource efficient transport system) states that 30% of road freight over 300 km should shift to other modes of transport, such as rail transport, by 2030, and more than 50% by 2050. It is also asserted that by 2050, the majority of medium-distance passenger transport in Europe should be on rails. In order to prepare rail transport to be able to absorb expected flows of passengers and goods, reconstruction and revitalization of main and regional railway lines is necessary. One of the goals of railway lines reconstruction is to increase their capacity. Several capacity research methods exist. They can be classified as technology-oriented types of performance evaluations and are used for determination of adequate track infrastructure and signal systems design, operating performance and quality of operation. In principle, there are two methods for capacity research - an analytical and a simulation approach. The paper will be focused on the simulation approach.
引用
收藏
页码:18 / 25
页数:8
相关论文
共 50 条
  • [11] SIMULATION OF RAILWAYS USING GENERAL-PURPOSE SIMULATION TOOLS
    Belosevic, Ivan
    Marton, Peter
    Milinkovic, Sanjin
    INTERNATIONAL CONFERENCE ON TRAFFIC AND TRANSPORT ENGINEERING (ICTTE 2018), 2018, : 733 - 737
  • [12] Nauticle: A general-purpose particle-based simulation tool
    Havasi-Toth, Balazs
    COMPUTER PHYSICS COMMUNICATIONS, 2020, 246 (246)
  • [13] Extending a general purpose simulation tool for exposure assessment of chemicals in the environment
    Wohlgemuth, Volker
    Page, Bernd
    Kreutzer, Wolfgang
    Systems Analysis Modelling Simulation, 2000, 39 (02): : 363 - 380
  • [14] INCREMENT OF RAILWAY LINE CAPACITY
    Ramunas, Vaidas
    Gailiene, Inesa
    Podagelis, Igoris
    ENVIRONMENTAL ENGINEERING, VOLS 1-3, 2011, : 1193 - 1199
  • [15] General purpose performance evaluation tool for analysis and comparison of ATA algorithms
    Williams, B
    Hulsey, D
    Amphay, S
    Stansbery, S
    Robinett, L
    AUTOMATIC TARGET RECOGNITION X, 2000, 4050 : 21 - 28
  • [16] Study of the possibility of using transmission in the lte system on a selected railway line for the purpose of running railway traffic
    CHRZAN M.
    Archives of Transport, 2021, 57 (01) : 91 - 101
  • [17] A GENERAL PURPOSE SYSTEMS SIMULATION
    GORDON, G
    COMMUNICATIONS OF THE ACM, 1961, 4 (11) : 481 - 481
  • [18] Automated steady-state analysis of switching power converters using a general-purpose simulation tool
    Maksimovic, D
    PESC'97: 28TH ANNUAL IEEE POWER ELECTRONICS SPECIALISTS CONFERENCE - RECORD, VOLS I AND II, 1997, : 1352 - 1358
  • [19] General-Purpose Modeling Tool
    Rujevcic, Renato
    Penco, Roberto
    2018 41ST INTERNATIONAL CONVENTION ON INFORMATION AND COMMUNICATION TECHNOLOGY, ELECTRONICS AND MICROELECTRONICS (MIPRO), 2018, : 1289 - 1294
  • [20] Using optimistic execution techniques as a parallelisation tool for general purpose computing
    Back, A
    Turner, S
    HIGH-PERFORMANCE COMPUTING AND NETWORKING, 1995, 919 : 21 - 26