A dynamic integration of CAPP and production scheduling based on concurrent engineering

被引:0
|
作者
Hua, GR [1 ]
Zhou, XH [1 ]
Ruan, XY [1 ]
Hua, GR [1 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Plast Forming Engn, Shanghai 200030, Peoples R China
关键词
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In order to rapidly respond to the market requirement and reduce the cost, the potential of the integration of CAPP and production scheduling is mined. Considering the facts that the operations optimal design often consumed most time in production preparative time, the treatment of unexpected events was passive in production and those optimized operations possibly had to be redesigned in a large scope, a dynamic integration of CAPP and production scheduling based on concurrent engineering is presented. In the new method, those aforementioned problems can be overcome using operations subsection algorithm and the extended event-driven rescheduling algorithm. A state that CAPP and production scheduling completed synchronously can be realized. A prototype of the system is built and a case is used to validate the proposed approach.
引用
收藏
页码:947 / 953
页数:7
相关论文
共 50 条
  • [1] Genetic algorithm for integration of CAPP and production scheduling
    Zhang, Zhi-Ying
    Tang, Cheng-Tong
    Zhang, Jian-Min
    Wang, Xin-Yong
    Sun, Lian-Sheng
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2002, 8 (08): : 621 - 624
  • [2] Research on CAPP system based on concurrent engineering
    Liu, Yanbin
    Ding, Xin
    Chen, Xun
    WMSCI 2006: 10TH WORLD MULTI-CONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL VII, PROCEEDINGS, 2006, : 326 - +
  • [3] Research on concurrent engineering based CAPP system
    Shanghai Jiaotong Daxue Xuebao, 5 (90-92):
  • [4] MODIFICATION OF CAPP SYSTEMS FOR CAPP SCHEDULING INTEGRATION
    LIAO, TW
    COATES, ER
    AGHAZADEH, F
    MANN, L
    GUHA, N
    COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) : 203 - 206
  • [5] MODIFICATION OF CAPP SYSTEMS FOR CAPP SCHEDULING INTEGRATION
    LIAO, TW
    COATES, ER
    AGHAZADEH, F
    MANN, L
    GUHA, N
    COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 26 (03) : 451 - 463
  • [6] Study on concurrent engineering-based CAPP system
    Liu, YB
    Zhang, F
    ADVANCES IN ABRASIVE PROCESSES, 2001, 202-2 : 271 - 275
  • [7] The study of CAPP CPPS integrated system based on concurrent engineering
    Liu, EF
    Li, SH
    Yang, G
    PROGRESS OF CUTTING AND GRINDING: WITH SOME TOPICS IN ADVANCED MANUFACTURE TECHNOLOGY, 1998, : 530 - 534
  • [8] CAPP Framework System for Concurrent Engineering
    李志忠
    王先逵
    刘成颖
    Tsinghua Science and Technology, 1999, (02) : 52 - 58
  • [9] Design task planning and dynamic scheduling to Concurrent Engineering
    Jiang, Gongliang
    DCABES 2006 PROCEEDINGS, VOLS 1 AND 2, 2006, : 1045 - 1047
  • [10] MES Scheduling Optimization and Simulation Based on CAPP/PPC Integration
    Cao, Yan
    Liu, Ning
    Yang, Lina
    Yang, Yanli
    SIXTH INTERNATIONAL SYMPOSIUM ON NEURAL NETWORKS (ISNN 2009), 2009, 56 : 613 - +