Application of bioaugmentation in the rapid start-up and stable operation of biological processes for municipal wastewater treatment at low temperatures

被引:57
|
作者
Guo, Jingbo [1 ,2 ,3 ]
Wang, Jihua [4 ]
Cui, Di [2 ,3 ]
Wang, Li [2 ,3 ]
Ma, Fang [2 ,3 ]
Chang, Chein-Chi [2 ,3 ,5 ]
Yang, Jixian [2 ,3 ]
机构
[1] NE Dianli Univ, Sch Civil Engn, Jilin 132012, Peoples R China
[2] Harbin Inst Technol, State Key Lab Urban Water Resources & Environm, Harbin 150090, Peoples R China
[3] Harbin Inst Technol, Sch Municipal & Environm Engn, Harbin 150090, Peoples R China
[4] Harbin Normal Univ, Acad Life Sci & Technol, Harbin 150025, Peoples R China
[5] Univ Maryland, Dept Civil & Environm Engn, Baltimore, MD 21250 USA
关键词
Low temperature; Bioaugmentation; Specialized mixed bacteria; Start-up; Municipal wastewater; SEQUENCING BATCH REACTOR; MICROBIAL COMMUNITIES; BACTERIAL COMMUNITY; SLUDGE; CARBON; STABILITY; CONSORTIUM; REMOVAL; SYSTEM; IMPACT;
D O I
10.1016/j.biortech.2010.03.093
中图分类号
S2 [农业工程];
学科分类号
0828 ;
摘要
To accelerate the start-up of biological municipal wastewater treatment processes at low temperatures and ensure their daily stable performances, bioaugmentation was adopted with the addition of specialized mixed bacteria. As a result, three types of biological processes were successfully started within 15 days and showed stable and efficient daily performances. Results of PCR-DGGE analysis demonstrated the long-term predominance of the bioaugmented specialized bacteria in the bioaugmented systems. And results of BIOLOG analysis showed that the bacterial community structure and catabolic capability of the biological systems varied with wastewater temperature variations. However, the stability of the bacterial community under normal operating conditions and adaptability to perturbations enabled the long-term stable and efficient performances of the biological systems. In conclusion, bioaugmentation was successful for rapid start-up and stable performances of three typical biological municipal wastewater treatment processes at low temperatures. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:6622 / 6629
页数:8
相关论文
共 50 条
  • [21] Adjusting Temperature and Settling Time to Achieve ANAMMOX Particles Rapid Start-up and Stable Operation
    Li H.-L.
    Li D.
    Zhang J.
    Liu B.
    Li S.
    Huanjing Kexue/Environmental Science, 2019, 40 (02): : 837 - 844
  • [22] Rapid start-up and stable operation of pilot scale denitrification-partial nitritation/anammox process for treating electroplating tail wastewater
    Zhang, Yu
    Li, Jiayi
    Chen, Yongxing
    Yang, Junfeng
    Chen, Zhenguo
    Wang, Xiaojun
    BIORESOURCE TECHNOLOGY, 2024, 409
  • [23] A new method of biological start-up in Arak activated sludge wastewater treatment plant
    Khalili, Abdolreza
    Mohebi, Mohammad Reza
    Mohebi, Mohammad
    Ashouri, Farideh
    WATER PRACTICE AND TECHNOLOGY, 2013, 8 (02): : 234 - 243
  • [24] Performance evaluation and kinetic modeling of the start-up of a UASB reactor treating municipal wastewater at low temperature
    F. Ilter Turkdogan-Aydinol
    Kaan Yetilmezsoy
    Sezen Comez
    Hurrem Bayhan
    Bioprocess and Biosystems Engineering, 2011, 34 : 153 - 162
  • [25] Performance evaluation and kinetic modeling of the start-up of a UASB reactor treating municipal wastewater at low temperature
    Turkdogan-Aydinol, F. Ilter
    Yetilmezsoy, Kaan
    Comez, Sezen
    Bayhan, Hurrem
    BIOPROCESS AND BIOSYSTEMS ENGINEERING, 2011, 34 (02) : 153 - 162
  • [26] Start-up alternatives and performance of an UASB pilot plant treating diluted municipal wastewater at low temperature
    Alvarez, J. A.
    Ruiz, I.
    Gomez, M.
    Presas, J.
    Soto, M.
    BIORESOURCE TECHNOLOGY, 2006, 97 (14) : 1640 - 1649
  • [27] Start-up and trial operation of the wastewater treatment plant at the Povazsky sugar factory, Trencianska Tepla
    Hutnan, M
    Drtil, M
    Valach, J
    Mico, S
    LISTY CUKROVARNICKE A REPARSKE, 1998, 114 (7-8): : 204 - 210
  • [28] Pilot Study on Start-up and Stable Operation at Low Temperature Based on Denitrifying Phosphorus Removal
    Zhang F.
    Yu D.-S.
    Liu J.
    Wang X.-X.
    Song X.-X.
    Li C.-J.
    Zhao F.-H.
    Huanjing Kexue/Environmental Science, 2019, 40 (09): : 4136 - 4142
  • [29] Rapid start-up of nitrifying MBBRs at low temperatures: nitrification, biofilm response and microbiome analysis
    Bradley Young
    Robert Delatolla
    Turki Abujamel
    Kevin Kennedy
    Edith Laflamme
    Alain Stintzi
    Bioprocess and Biosystems Engineering, 2017, 40 : 731 - 739
  • [30] Rapid start-up of nitrifying MBBRs at low temperatures: nitrification, biofilm response and microbiome analysis
    Young, Bradley
    Delatolla, Robert
    Abujamel, Turki
    Kennedy, Kevin
    Laflamme, Edith
    Stintzi, Alain
    BIOPROCESS AND BIOSYSTEMS ENGINEERING, 2017, 40 (05) : 731 - 739