Progress payments in project scheduling problems

被引:27
|
作者
Vanhoucke, M
Demeulemeester, E
Herroelen, W
机构
[1] Vlerick Leuven Gent Management Sch, Operat & Technol Management Ctr, B-9050 Ghent, Belgium
[2] Univ Ghent, Fac Econ & Business Adm, Dept Management Informat Operat Management & Tech, B-9000 Ghent, Belgium
[3] Katholieke Univ Leuven, Dept Appl Econ, Operat Management Grp, B-3000 Louvain, Belgium
关键词
branch and bound; project scheduling; net present value; progress payments;
D O I
10.1016/S0377-2217(02)00452-6
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we study the unconstrained project scheduling problem with discounted cash flows where the net cash flows are assumed to be dependent on the completion times of the corresponding activities. Cash outflows occur when an activity is completed whereas cash inflows are incurred as progress payments at the end of some time period. The objective is to schedule the activities in order to maximize the net present value of the project subject to the precedence constraints and a fixed deadline. This paper extends the ever-growing amount of research concerning the financial aspects in project scheduling in which cash flows are time-dependent. We introduce a branch-and-bound algorithm which computes upper bounds by making piecewise linear overestimations. In doing so, the algorithm transforms the problem into a weighted earliness-tardiness project scheduling problem. The algorithm is extended with two new rules in order to reduce the size of the branch-and-bound tree. Computational results are reported. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:604 / 620
页数:17
相关论文
共 50 条
  • [21] Generic negotiation mechanisms with side payments - Design, analysis and application for decentralized resource-constrained multi-project scheduling problems
    Homberger, Joerg
    Fink, Andreas
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 261 (03) : 1001 - 1012
  • [22] Work in Progress: GeMS: A Generator for Modulo Scheduling Problems
    Oppermann, Julian
    Vollbrecht, Sebastian
    Reuter-Oppermann, Melanie
    Sinnen, Oliver
    Koch, Andreas
    2018 INTERNATIONAL CONFERENCE ON COMPILERS, ARCHITECTURES AND SYNTHESIS FOR EMBEDDED SYSTEMS (CASES), 2018,
  • [23] A New Priority Rule for Solving Project Scheduling Problems
    Patience I. Adamu
    Hilary I. Okagbue
    Pelumi E. Oguntunde
    Wireless Personal Communications, 2019, 106 : 681 - 699
  • [24] Investigation of surrogate measures of robustness for project scheduling problems
    Zahid, Taiba
    Agha, Mujtaba Hassan
    Schmid, Thorsten
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 129 : 220 - 227
  • [25] Solving project scheduling problems by minimum cut computations
    Möhring, RH
    Schulz, AS
    Stork, F
    Uetz, M
    MANAGEMENT SCIENCE, 2003, 49 (03) : 330 - 350
  • [26] Minslack and Kangaroo Algorithms for Fuzzy Project Scheduling Problems
    Atli, Omer
    Kahraman, Cengiz
    JOURNAL OF MULTIPLE-VALUED LOGIC AND SOFT COMPUTING, 2013, 20 (1-2) : 189 - 219
  • [27] Packing problems and project scheduling models: an integrating perspective
    Hartmann, S
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2000, 51 (09) : 1083 - 1092
  • [28] A unified nomenclature for project scheduling problems (RCPSP and RCMPSP)
    Villafanez, Felix A.
    Poza, David
    Lopez-Paredes, Adolfo
    Pajares, Javier
    DIRECCION Y ORGANIZACION, 2018, 64 : 56 - 60
  • [29] Solving project scheduling problems with a heuristic learning algorithm
    Zamani, R
    Shue, LY
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (07) : 709 - 716
  • [30] Minslack and kangaroo algorithms for fuzzy project scheduling problems
    Atli, Omer
    Kahraman, Cengiz
    Journal of Multiple-Valued Logic and Soft Computing, 2012, 20 (1-2) : 189 - 219