Stochastic security-constrained unit commitment

被引:654
|
作者
Wu, Lei [1 ]
Shabidehpour, Mohammad [1 ]
Li, Tao [1 ]
机构
[1] IIT, Dept Elect & Comp Engn, Chicago, IL 60616 USA
关键词
Lagrangian relaxation; mixed integer program; Monte Carlo simulation; random power outages; scenario aggregation; security-constrained unit commitment; subgradient method; uncertainty;
D O I
10.1109/TPWRS.2007.894843
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a stochastic model for the longterm solution of security-constrained unit commitment (SCUC). The proposed approach could be used by vertically integrated utilities as well as the ISOs in electricity markets. In this model, random disturbances, such as outages of generation units and transmission lines as well as load forecasting inaccuracies, are modeled as scenario trees using the Monte Carlo simulation method. For dual optimization, coupling constraints among scenarios are relaxed and the optimization problem is decomposed into deterministic longterm SCUC subproblems. For each deterministic long-term SCUC, resource constraints represent fuel find emission constraints (in the case of vertically integrated utilities) and energy constraints (in the case of electricity markets). Lagrangian relaxation is used to decompose subproblems with long-term SCUC into tractable short-term MIP-based SCUC subproblems without resource constraints. Accordingly, penalty prices (Lagrangian multipliers) are signals to coordinate the master problem and small-scale subproblems. Computational requirements for solving scenario-based optimization models depend on the number of scenarios in which the objective is to minimize the weighted-average generation cost over the entire scenario tree. In large scale applications, the scenario reduction method is introduced for enhancing a tradeoff between calculation speed and accuracy of long-term SCUC solution. Numerical simulations indicate the effectiveness of the proposed approach for solving the stochastic security-constrained unit commitment.
引用
收藏
页码:800 / 811
页数:12
相关论文
共 50 条
  • [1] Security-constrained unit commitment with stochastic constraints
    Shahidehpour, Mohammad
    [J]. 2007 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-10, 2007, : 4894 - 4896
  • [2] Fully Parallel Stochastic Security-Constrained Unit Commitment
    Wang, Chunheng
    Fu, Yong
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (05) : 3561 - 3571
  • [3] Security region based security-constrained unit commitment
    YU YiXin
    QIN Chao
    [J]. Science China(Technological Sciences), 2013, 56 (11) - 2744
  • [4] Security region based security-constrained unit commitment
    YiXin Yu
    Chao Qin
    [J]. Science China Technological Sciences, 2013, 56 : 2732 - 2744
  • [5] Security region based security-constrained unit commitment
    YU YiXin
    QIN Chao
    [J]. Science China Technological Sciences, 2013, (11) : 2732 - 2744
  • [6] Security region based security-constrained unit commitment
    Yu YiXin
    Qin Chao
    [J]. SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2013, 56 (11) : 2732 - 2744
  • [7] A Comprehensive Review of Security-constrained Unit Commitment
    Yang, Nan
    Dong, Zhenqiang
    Wu, Lei
    Zhang, Lei
    Shen, Xun
    Chen, Daojun
    Zhu, Binxin
    Liu, Yikui
    [J]. JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2022, 10 (03) : 562 - 576
  • [8] Direct method for security-constrained unit commitment
    ALPHATECH, Inc, Burlington, United States
    [J]. IEEE Trans Power Syst, 3 (1329-1342):
  • [9] Comparative Study of Stochastic Unit Commitment and Security-Constrained Unit Commitment Using High Performance Computing
    Papavasiliou, Anthony
    Oren, Shmuel S.
    [J]. 2013 EUROPEAN CONTROL CONFERENCE (ECC), 2013, : 2507 - 2512
  • [10] Security-constrained unit commitment with AC constraints
    Fu, Y
    Shahidehpour, M
    Li, ZY
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (03) : 1538 - 1550