Security-constrained unit commitment with stochastic constraints

被引:0
|
作者
Shahidehpour, Mohammad [1 ]
机构
[1] IIT, Dept Elect & Comp Engn, Chicago, IL 60616 USA
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a stochastic model for the long-term solution of security-constrained unit commitment (SCUC). The proposed approach could be used by vertically integrated utilities as well as the ISOs in electricity markets. In this model, random disturbances, such as outages of generation units and transmission lines as well as load forecasting inaccuracies, are modeled as scenario trees using the Monte Carlo simulation method. For dual optimization, coupling constraints among scenarios are relaxed and the optimization problem is decomposed into deterministic long-term SCUC subproblems. For each deterministic long-term SCUC, resource constraints represent fuel and emission constraints (in the case of vertically integrated utilities) and energy constraints (in the case of electricity markets). Lagrangian relaxation is used to decompose subproblems with long-term SCUC into tractable short-term MIP-based SCUC subproblems without resource constraints. Accordingly, penalty prices (Lagrangian multipliers) are signals to coordinate the master problem and small-scale subproblems. Computational requirements for solving scenario-based optimization models depend on the number of scenarios in which the objective is to minimize the weighted-average generation cost over the entire scenario tree. In large scale applications, the scenario reduction method is introduced for enhancing a tradeoff between calculation speed and accuracy of long-term SCUC solution. Numerical simulations indicate the effectiveness of the proposed approach for solving the stochastic security-constrained unit commitment.
引用
收藏
页码:4894 / 4896
页数:3
相关论文
共 50 条
  • [1] Stochastic security-constrained unit commitment
    Wu, Lei
    Shabidehpour, Mohammad
    Li, Tao
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (02) : 800 - 811
  • [2] Security-constrained unit commitment with AC constraints
    Fu, Y
    Shahidehpour, M
    Li, ZY
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) : 1001 - 1013
  • [3] Security-constrained unit commitment with AC constraints
    Fu, Y
    Shahidehpour, M
    Li, ZY
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (03) : 1538 - 1550
  • [4] Determining inactive constraints in stochastic security-constrained unit commitment using cumulants
    Ghannadi, Siavash
    Mehrtash, Mahdi
    Mohammadi, Mohammad
    Raoofat, Mahdi
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2017, 32 (03) : 2123 - 2135
  • [5] Security-Constrained Unit Commitment With Dynamic Gas Constraints
    Correa-Posada, Carlos M.
    Sanchez-Martin, Pedro
    [J]. 2015 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2015,
  • [6] Fully Parallel Stochastic Security-Constrained Unit Commitment
    Wang, Chunheng
    Fu, Yong
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (05) : 3561 - 3571
  • [7] Security-Constrained Unit Commitment With Natural Gas Transmission Constraints
    Liu, Cong
    Shahidehpour, Mohammad
    Fu, Yong
    Li, Zuyi
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2009, 24 (03) : 1523 - 1536
  • [8] Security-Constrained Unit Commitment With Natural Gas Pipeline Transient Constraints
    Badakhshan, Sobhan
    Ehsan, Mehdi
    Shahidehpour, Mohammad
    Hajibandeh, Neda
    Shafie-Khah, Miadreza
    Catalao, Joao P. S.
    [J]. IEEE TRANSACTIONS ON SMART GRID, 2020, 11 (01) : 118 - 128
  • [9] Security-Constrained Unit Commitment With Linearized System Frequency Limit Constraints
    Ahmadi, Hamed
    Ghasemi, Hassan
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (04) : 1536 - 1545
  • [10] Security region based security-constrained unit commitment
    YiXin Yu
    Chao Qin
    [J]. Science China Technological Sciences, 2013, 56 : 2732 - 2744