The Preemptive Stocker Dispatching Rule of Automatic Material Handling System in 300 mm Semiconductor Manufacturing Factories

被引:0
|
作者
Wang, C. N. [1 ]
Lin, H. S. [1 ]
Hsu, H. P. [2 ]
Wang, Yen-Hui [3 ]
Chang, Y. P. [1 ]
机构
[1] Natl Kaohsiung Univ Appl Sci, Kaohsiung 80778, Taiwan
[2] Natl Kaohsiung Marine Univ, Kaohsiung, Taiwan
[3] Chihlee Univ Technol, New Taipei, Taiwan
关键词
AMHS; 300 mm Semiconductor manufacturing; OHT; Stocker;
D O I
10.1088/1742-6596/710/1/012033
中图分类号
O7 [晶体学];
学科分类号
0702 ; 070205 ; 0703 ; 080501 ;
摘要
The integrated circuit (IC) manufacturing industry is one of the biggest output industries in this century. The 300mm wafer fabs is the major fab size of this industry. The automatic material handling system (AMHS) has become one of the most concerned issues among semiconductor manufacturers. The major lot delivery of 300mm fabs is used overhead hoist transport (OHT). The traffic jams are happened frequently due to the wide variety of products and big amount of OHTs moving in the fabs. The purpose of this study is to enhance the delivery performance of automatic material handling and reduce the delay and waiting time of product transportation for both hot lots and normal lots. Therefore, this study proposes an effective OHT dispatching rule: preemptive stocker dispatching (PSD). Simulation experiments are conducted and one of the best differentiated preemptive rule, differentiated preemptive dispatching (DPD), is used for comparison. Compared with DPD, The results indicated that PSD rule can reduce average variable delivery time of normal lots by 13.15%, decreasing average variable delivery time of hot lots by 17.67%. Thus, the PSD rule can effectively reduce the delivery time and enhance productivity in 300 mm wafer fabs.
引用
收藏
页数:8
相关论文
共 46 条
  • [21] A Novel Vehicle Pre-dispatching Method for Automated Material Handling System in Semiconductor Manufacturing
    Lin, James T.
    Huang, Chih-Wei
    PROCEEDINGS OF 2012 3RD INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2012), 2013, : 861 - 872
  • [22] The heuristic preemptive dispatching method for convey-based automated material handling system of 450 mm wafer fabrication
    Wang, Chia-Nan
    Lee, Yueh-Hsiu
    Hsu, Hsien-Pin
    Dinh-Hiep Nguyen
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 96 : 52 - 60
  • [23] A 300mm semiconductor manufacturing foreign material reduction initiative
    Long, Christopher W.
    Sienkiewicz, Thomas
    2007 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE, 2007, : 220 - +
  • [24] A 300-mm semiconductor manufacturing foreign material reduction initiative
    Long, Christopher W.
    Sienkiewicz, Thomas
    Pfeiffer, Gerd
    Guse, Michael
    Peterman, James
    Brendler, Andrew
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2008, 21 (03) : 308 - 315
  • [25] Effective OHT dispatching for differentiated material handling services in 300mm wafer foundry
    Wang, CN
    Liao, DY
    2003 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-3, PROCEEDINGS, 2003, : 1027 - 1032
  • [26] A survey of automated material handling systems in 300-mm semiconductor fabs
    Agrawal, GK
    Heragu, SS
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2006, 19 (01) : 112 - 120
  • [27] Enabling facility re-use for 300mm semiconductor manufacturing via integration of automated material handling system and facility design
    Seall, Steve
    Steele, Douglas C.
    Jung, Melvin
    2006 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP, 2006, : 188 - +
  • [28] Simulation study for a proposed segmented automated material handling system design for 300-mm semiconductor fabs
    Hsieh, Chiung-Hsi
    Cho, Chiwoon
    Yang, Taho
    Chang, Ting-Jiun
    SIMULATION MODELLING PRACTICE AND THEORY, 2012, 29 : 18 - 31
  • [29] Using Rotacaster in the Heuristic Preemptive Dispatching Method for Conveyor-Based Material Handling of 450 mm Wafer Fabrication
    Wang, Chia-Nan
    Wang, Yen-Hui
    Hsu, Hsien-Pin
    Thanh-Tung Trinh
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2016, 29 (03) : 230 - 238
  • [30] A breakthrough in optimizing throughput and manufacturing efficiency via factory-wide dynamic WIP dispatching in 300mm semiconductor manufacturing
    Li, B
    Wu, J
    Herring, MP
    Mouli, C
    ISSM 2005: IEEE International Symposium on Semiconductor Manufacturing, Conference Proceedings, 2005, : 39 - 42