Neural network models for actual duration of Greek highway projects

被引:6
|
作者
Titirla, Magdalini [1 ]
Arctoulis, Gcorgios [2 ]
机构
[1] Univ Claude Bernard Lyon 1, Fac Sci & Technol, Villeurbanne, France
[2] Aristotle Univ Thessaloniki, Dept Civil Engn, Thessaloniki, Greece
关键词
Neural networks; Attribute selection; Highway construction; Predicting models; Project actual duration; WEKA; CONSTRUCTION; SUPPORT; IMPACT; COST;
D O I
10.1108/JEDT-01-2019-0027
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose This paper aims to examine selected similar Greek highway projects to create artificial neural network-based models to predict their actual construction duration based on data available at the bidding stage. Design/methodology/approach Relevant literature review is presented that highlights similar research approaches. Thirty-seven highway projects, constructed in Greece, with similar type of available data, were examined. Considering each project's characteristics and the actual construction duration, correlation analysis is implemented, with the aid of SPSS. Correlation analysis identified the most significant project variables toward predicting actual duration. Furthermore, the WEKA application, through its attribute selection function, highlighted the most important subset of variables. The selected variables through correlation analysis and/or WEKA and appropriate combinations of these are used as input neurons for a neural network. Fast Artificial Neural Network (FANN) Tool is used to construct neural network models in an effort to predict projects' actual duration. Findings Variables that significantly correlate with actual time at completion include initial cost, initial duration, length, lanes, technical projects, bridges, tunnels, geotechnical projects, embankment, landfill, land requirement (expropriation) and tender offer. Neural networks' models succeeded in predicting actual completion time with significant accuracy. The optimum neural network model produced a mean squared error with a value of 6.96E-06 and was based on initial cost, initial duration, length, lanes, technical projects, tender offer, embankment, existence of bridges, geotechnical projects and landfills. Research limitations/implications - The sample size is limited to 37 projects. These are extensive highway projects with similar work packages, constructed in Greece. Practical implications - The proposed models could early in the planning stage predict the actual project duration. Originality/value The originality of the current study focuses both on the methodology applied (combination of Correlation Analysis, WEKA, FannTool) and on the resulting models and their potential application for future projects.
引用
收藏
页码:1323 / 1339
页数:17
相关论文
共 50 条
  • [31] Application of Neural Network in the Cost Estimation of Highway Engineering
    Wang Xin-Zheng
    Duan Xiao-chen
    Liu Jing-yan
    JOURNAL OF COMPUTERS, 2010, 5 (11) : 1762 - 1766
  • [32] Lightweight Neural Network for Highway Toll Vehicle Classification
    Yang Jingkai
    Liu Weiyu
    PROCEEDINGS OF THE 36TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC 2024, 2024, : 881 - 884
  • [33] Knowledge based decision support tool for duration and cost overrun analysis of highway construction projects
    Arun, C.
    Rao, B.N.
    Journal of the Institution of Engineers (India): Civil Engineering Division, 2007, 88 (AUG.): : 27 - 33
  • [34] Locating Traffic Sensors on a Highway Network Models and Algorithms
    Sayyady, Fatemeh
    Fathi, Yahya
    List, George F.
    Stone, John R.
    TRANSPORTATION RESEARCH RECORD, 2013, (2339) : 30 - 38
  • [35] Application of the Improved BP Network Model in Social Impact Evaluation of Highway Projects
    Li, Mingshun
    Chen, Tao
    Tang, Jiahuan
    2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (MSE 2010), VOL 5, 2010, : 21 - 24
  • [36] BP neural network prediction model of highway network land in urbanization process
    Bian F.
    Huang X.
    Liu R.
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2010, 40 (05): : 1073 - 1076
  • [37] Using Analytical Network Process to Analyze Construction Method Selection in Highway Projects
    Ozcan-Deniz, Gulbin
    Zhu, Yimin
    PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 64 - 69
  • [38] Adaptive Neural Network Controller for Nonlinear Highway Bridge Benchmark
    Rababah, Ahmad Y.
    Bani-Hani, Khaldoon A.
    Baraham, Wasim S.
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2019, 13 (02) : 308 - 324
  • [39] SETTING UP A PROBABILISTIC NEURAL NETWORK FOR CLASSIFICATION OF HIGHWAY VEHICLES
    Selekwa, Majura F.
    Kwigizile, Valerian
    Mussa, Renatus N.
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE AND APPLICATIONS, 2005, 5 (04) : 411 - 423
  • [40] Highway Traffic Density Control Based on RBF Neural Network
    Liang, Xinrong
    Liang, Shuqun
    Yan, Mu
    Liang, Xinrong
    2017 CHINESE AUTOMATION CONGRESS (CAC), 2017, : 3931 - 3936