Intelligent Scheduling at NASA: Application to Ground Operations at Kennedy Space Center

被引:0
|
作者
Xu, Steven [1 ]
Stottler, Richard [1 ]
Richards, Robert [1 ]
机构
[1] Stottler Henke Associates Inc, 1650 S Amphlett Blvd,Suite 300, San Mateo, CA 94402 USA
关键词
D O I
暂无
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
NASA's Kennedy Space Center (KSC) is working with Stottler Henke to improve KSC's Ground Processing (GP) scheduling. The solution called, Aurora-KSC, has been designed, developed and deployed at KSC to automate a large amount of Kennedy Space Center's planning, scheduling, and execution decision-making. Aurora-KSC leverages Aurora, the world's most intelligent scheduling framework; Aurora itself originated in part from many earlier NASA-funded efforts and has been utilized by NASA for some of its most complex scheduling challenges, including the scheduling of the maintenance, repair & overhaul (MRO) of the Space Shuttle during its tenure. Aurora-KSC expands on this foundation, enhancing and extending Aurora for improved generalization and adaptability. This includes an interface with Primavera P6 and Microsoft Project so project information already available in these formats can benefit from Aurora-KSC. This allows KSC to realize significant efficiency improvements in several different areas. Aurora-KSC also includes adaptive execution, that is, executing the scheduled activities/procedures intelligently as actual execution actually deviates from the original schedule. Aurora-KSC is available to the wider NASA community to provide its many benefits to the rest of NASA. Aurora-KSC is being applied to several problems at KSC relating to Ground Processing (GP). The delivered application improves the scheduling of Space Launch System (SLS) Processing and verification & validation (V&V) activity, including reduced turnaround time in response to changes and what-ifs, and more optimal schedules. This paper reviews the goals that lead to the development of Aurora-KSC, including background on the pre-existing proven technologies that were leveraged. The application to NASA challenges will be discussed with benefits to date. Finally, the benefits of leveraging Aurora-KSC for other NASA applications will be discussed.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] THE KENNEDY-SPACE-CENTER TELEVISION SYSTEM
    BROWN, CT
    SMPTE JOURNAL, 1991, 100 (07): : 528 - 540
  • [42] On the scheduling of operations in a chat contact center
    Legros, Benjamin
    Jouini, Oualid
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 274 (01) : 303 - 316
  • [43] Practical scheduling for call center operations
    Dietz, Dennis C.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2011, 39 (05): : 550 - 557
  • [44] Nowcasting for space shuttle landings at Kennedy Space Center, Florida
    Bauman, WH
    Businger, S
    BULLETIN OF THE AMERICAN METEOROLOGICAL SOCIETY, 1996, 77 (10) : 2295 - 2305
  • [45] The Capitol College Space Operations Institute: A Partnership with NASA
    Gibbs, Michael G.
    Walters, Angela
    Dolan, Ken
    EARTH AND SPACE SCIENCE: MAKING CONNECTIONS IN EDUCATION AND PUBLIC OUTREACH, 2011, 443 : 237 - 240
  • [46] An intelligent operations scheduling system in a job shop
    Park, J
    Kang, M
    Lee, K
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1996, 11 (02): : 111 - 119
  • [47] An intelligent operations scheduling system in a job shop
    Park, Jihyung
    Kang, Mujin
    Lee, Kyoil
    1996, (11):
  • [48] Considerations above operations scheduling intelligent system
    Prostean, Gabriela
    ICCC 2007: 5TH IEEE INTERNATIONAL CONFERENCE ON COMPUTATIONAL CYBERNETICS, PROCEEDINGS, 2007, : 173 - 178
  • [49] NASA Food Technology Commercial Space Center
    Olson, DG
    ENGINEERING AND FOOD FOR THE 21ST CENTURY, 2002, : 1007 - 1010
  • [50] CONSOLIDATED SPACE OPERATIONS CENTER
    MOFFAT, MH
    HOLLANDER, S
    ISA TRANSACTIONS, 1981, 20 (03) : 23 - 30