Operational control of an integrated drum boiler of a coal fired thermal power plant

被引:14
|
作者
Chandrasekharan, Sreepradha [1 ]
Panda, Rames C. [1 ]
Swaminathan, Bhuvaneswari Natrajan [2 ]
Panda, Atanu [3 ]
机构
[1] CSIR CLRI, Dept Chem Engn, Madras 600020, Tamil Nadu, India
[2] GKM Engg Coll, Elect & Instrumentat, Madras 600089, Tamil Nadu, India
[3] Inst Engn & Management, Kolkata, India
关键词
Mathematical modeling; Process control; Subcritical drum boiler; Inverse decoupling; Thermal power plant; Parameter identification; CONTROL-SYSTEM-DESIGN; RANGE PREDICTIVE CONTROL; TURBINE SYSTEM; MODEL; VALIDATION; SIMULATION; STRATEGY;
D O I
10.1016/j.energy.2018.06.157
中图分类号
O414.1 [热力学];
学科分类号
摘要
Boiler in thermal-power-plant plays important role in generation of power. Conventional subcriticalboilers use single-loop controls which are less efficient. An effective control of temperature and pressure of boiler is necessary to enable safe power generation. This article discusses application of three different multivariable-control strategies, namely, PID (Proportional-Integral- Derivative), MAC (Model Predictive Controller) and Inverse-decoupling-control to the individual units of boiler (economizer, drum, super-heater) as well as to the integrated boiler unit of the coal-fired thermal-power-plant separately. The mathematical-model derived based on mass-balance and energy-balance equations of economizer, drum and superheater units are used for the synthesis of controller. The non-square nature of mathematical-model carries complexity in the design of controllers. The performances, based on minimization of objective-function containing closed-loop error along with the control-effort of individual and integrated units, of the boiler using IMC (Internal-Model-Control) based PID, Inversedecouple and MPC in the presence of disturbances are analyzed and compared. The results show that multi-loop control of integrated units ensures asymptotic-stability compared to unstable single-loop control and the controller needs to take less effort in the case of the integrated unit compared to the individual units. The results suggest for implementation of integrated multi-loop control instead of controlling individual boiler units. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:977 / 987
页数:11
相关论文
共 50 条
  • [11] Genetic adaptive control for drum level of a power plant boiler
    Huang, Yonghong
    Li, Nianping
    Shi, Yangchun
    Yi, Yixun
    2006 IMACS: MULTICONFERENCE ON COMPUTATIONAL ENGINEERING IN SYSTEMS APPLICATIONS, VOLS 1 AND 2, 2006, : 1965 - +
  • [12] Modeling of the Coal-fired Utility Boiler in a Thermal Power Plant Based on Macro Energy Balance
    Yu, Tong
    Yuan, Jingqi
    THERMAL, POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2013, 732-733 : 29 - 36
  • [13] A new coordinated control strategy for boiler-turbine system of coal-fired power plant
    Li, SY
    Liu, HB
    Cai, WJ
    Soh, YC
    Xie, LH
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2005, 13 (06) : 943 - 954
  • [14] Mathematical model for integrated coal fired thermal boiler using physical laws
    Sreepradha, Chandrasekharan
    Panda, Rames Chandra
    Bhuvaneswari, Natrajan Swaminathan
    ENERGY, 2017, 118 : 985 - 998
  • [15] Development and Application of boiler combustion air Flow control algorithm for coal-fired power plant
    Lim, Geon Pyo
    Lee, Heung-Ho
    PROCEEDINGS OF THE 2013 IEEE 8TH CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA), 2013, : 662 - 667
  • [16] Sliding Mode Predictive Control of Main Steam Pressure in Coal-fired Power Plant Boiler
    Shi Yuanhao
    Wang Jingcheng
    Zhang Yunfeng
    CHINESE JOURNAL OF CHEMICAL ENGINEERING, 2012, 20 (06) : 1107 - 1112
  • [17] PROCONTROL-P AND PROCONTROL-K CONTROL THE BURNER OF A DRUM BOILER IN THE COAL-FIRED POWER-PLANT MAE-MOH (THAILAND)
    VOSER, L
    BROWN BOVERI REVIEW, 1984, 71 (08): : 363 - 370
  • [18] An approach of PI gain scheduling with hysteresis switching for the control of boiler drum level in the coal-fired power generation units
    Bi, Zhenfu
    Pan, Yuezhi
    Zhang, Qiang
    Wang, Fusheng
    Proceedings of the 2006 IEEE International Conference on Control Applications, Vols 1-4, 2006, : 970 - 974
  • [19] China's largest coal-fired power plant operational
    不详
    E&MJ-ENGINEERING AND MINING JOURNAL, 2008, 209 (01): : 22 - 22
  • [20] NUMERICAL INVESTIGATION OF THERMOELECTRIC TOPPING CYCLE IN COAL FIRED POWER PLANT BOILER
    Silaen, Armin
    Wu, Bin
    Zhou, Chenn
    PROCEEDINGS OF THE ASME 5TH INTERNATIONAL CONFERENCE ON MICRO/NANOSCALE HEAT AND MASS TRANSFER, 2016, VOL 2, 2016,