Vacuum vessel contact dose build-up from start to end of ITER operations

被引:0
|
作者
Cambi, G [1 ]
Cepraga, DG [1 ]
Frisoni, M [1 ]
Carloni, F [1 ]
Chiasera, A [1 ]
机构
[1] Univ Bologna, Dept Phys, I-40126 Bologna, Italy
关键词
D O I
10.1109/FUSION.2003.1426611
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The paper presents the ITER Vacuum Vessel (VV) contact dose build up evaluation from start to end of the machine life (expected to occur after about 20 years of operations, corresponding to an average neutron fluence of 0.5 MWa/m(2) on the First Wall). The reference design used for ITER Generic Site Safety Report (GSSR) has been considered. Results are given for the inboard and outboard W regions (and for both the front and rear 316L(N)-IG walls) in the radial equatorial plane. The Sn calculation sequence SCALENEA-1 (with the FISPACT-99 activation code) has been used for the analysis. The results point out that after only 20 seconds of irradiation at the nominal neutron power load, the contact dose of the most activated W zone (i.e. the outboard region, front wall), reaches the hands-on limit of 10 muSv/h just after few months cooling time, requiring remote handling operations on that component in maintenance cells.
引用
收藏
页码:156 / 159
页数:4
相关论文
共 50 条
  • [1] Design finalization and start of construction of ITER vacuum vessel
    Ioki, K.
    Barabash, V.
    Choi, C. H.
    Cordier, J-J
    Daly, E.
    Dani, S.
    Davis, J.
    Giraud, B.
    Gribov, Y.
    Heitzenroeder, Ph
    Harnlyn-Harris, C.
    Johnson, G.
    Jones, L.
    Jun, C.
    Kim, B. C.
    Kuzmin, E.
    Le Barbier, R.
    Loesser, D.
    Martinez, J-M
    Merola, M.
    Pathak, H.
    Preble, J.
    Reich, J.
    Sa, J. W.
    Terasawa, A.
    Utin, Yu
    Wang, X.
    Wu, S.
    FUSION ENGINEERING AND DESIGN, 2011, 86 (6-8) : 593 - 597
  • [2] ITER vacuum vessel: Design review and start of procurement process
    Ioki, K.
    Bachmann, C.
    Chappuis, P.
    Cordier, J. -J.
    Giraud, B.
    Gribov, Y.
    Jones, L.
    Jun, C.
    Kim, B. C.
    Kuzmin, E.
    Pathak, H.
    Readman, P.
    Sugihara, M.
    Utin, Yu.
    Wang, X.
    Wu, S.
    FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) : 229 - 235
  • [3] Validation of Film Dosimetry in the Dose Build-Up Region
    Corradini, N.
    Presilla, S.
    Sassowsky, M.
    Schombourg, K.
    MEDICAL PHYSICS, 2012, 39 (06) : 3613 - 3613
  • [4] DOSE BUILD-UP FACTORS FOR LEAD STEEL AND WATER
    HONIG, A
    KERNTECHNIK ISOTOPENTECHNIK UND CHEMIE, 1965, 7 (11): : 506 - &
  • [5] CALCULATION OF PERCENTAGE DEPTH DOSE IN REGIONS OF BUILD-UP
    BOMFORD, CK
    BRITISH JOURNAL OF RADIOLOGY, 1969, 42 (499): : 551 - &
  • [6] Build-Up an Economical Tool for Machining Operations Cost Estimation
    Silva, Francisco J. G.
    Sousa, Vitor F. C.
    Pinto, Arnaldo G.
    Ferreira, Luis P.
    Pereira, Teresa
    METALS, 2022, 12 (07)
  • [7] Mock-up of a support structure of the ITER vacuum vessel
    Ahn, H. J.
    Sa, J. W.
    Kim, Y. K.
    Hong, Y. S.
    Choi, J. H.
    Kwon, T. H.
    Lee, J. S.
    Park, K. H.
    Kim, T. S.
    Ha, W. I.
    Choi, I. S.
    Kim, B. C.
    Hong, K. H.
    Choi, C. H.
    FUSION ENGINEERING AND DESIGN, 2009, 84 (2-6) : 375 - 379
  • [8] Three-year build-up to Medinfo nears end
    Anon
    2001, British Computer Society (43):
  • [9] USE OF A THERMOLUMINESCENT DOSEMETER FOR DOSE MEASUREMENTS IN BUILD-UP REGION
    ROBINSON, JE
    MCDOUGAL.RS
    PHYSICS IN MEDICINE AND BIOLOGY, 1966, 11 (01): : 145 - &
  • [10] COST BUILD-UP FROM MINE TO PRODUCT
    CHILTON, LV
    CROWTHER, J
    JOURNAL OF THE INSTITUTE OF METALS, 1966, 94 (10): : 337 - &