Study on Production Process of New U-shaped Canal

被引:0
|
作者
Sun, Jinglu [1 ]
Zhang, Shoujie [1 ]
Zhang, Bin [1 ]
Liu, Lijia [1 ]
机构
[1] Heilongjiang Acad Water Conservancy, Heilongjiang Prov Key Lab Engn Seasonal Frozen So, Heilongjiang 150080, Peoples R China
关键词
Production Process; U-shaped canal; water conservancy project;
D O I
10.4028/www.scientific.net/AMM.675-677.947
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
To solve the problem in the process of prefabrication of U-shaped canal, this paper mainly introduces the U-shaped canal production line that adopts production process of flowing water machine and continuous curing method. The production process can adapt to a variety of specifications U 300 - U1000 (length of concrete U-shaped canal products is 2000mm). Tank production line has production capacity of concrete U-shaped canal of 100 cubic meters every day. The production line can automatically run, in each location as well as human intervention, easy to control the production rhythm and production organization and management. Through the process, making the U-shaped canal can be manufactured in large-scale. It can play an important role in national food security, steady and rapid economic development and social harmony and stability on basis of water conservancy.
引用
收藏
页码:947 / 950
页数:4
相关论文
共 50 条
  • [41] ALCOHOL AND THE U-SHAPED CURVE
    SKRABANEK, P
    LANCET, 1989, 1 (8629): : 105 - 105
  • [42] ANALYSIS OF U-SHAPED METACONTRAST
    BERNSTEIN, IH
    PROCTOR, RW
    BELCHER, J
    SCHURMAN, DL
    PERCEPTION & PSYCHOPHYSICS, 1974, 16 (02): : 329 - 336
  • [43] ALCOHOL AND THE U-SHAPED CURVE
    SHAPER, AG
    WANNAMETHEE, G
    WALKER, M
    LANCET, 1989, 1 (8633): : 336 - 336
  • [44] Flow in a U-shaped burrow
    Mori, K
    Shikasho, S
    Hiramatsu, K
    Takegaki, T
    JOURNAL OF THE FACULTY OF AGRICULTURE KYUSHU UNIVERSITY, 2000, 45 (01): : 267 - 276
  • [45] Overfall in U-shaped channels
    Dey, S
    JOURNAL OF ENGINEERING MECHANICS-ASCE, 2003, 129 (03): : 358 - 362
  • [46] A U-shaped Europe? A simulation study of industrial location
    Forslid, R
    Haaland, JI
    Knarvik, KHM
    JOURNAL OF INTERNATIONAL ECONOMICS, 2002, 57 (02) : 273 - 297
  • [47] On the Necessity of U-Shaped Learning
    Carlucci, Lorenzo
    Case, John
    TOPICS IN COGNITIVE SCIENCE, 2013, 5 (01) : 56 - 88
  • [48] THE U-SHAPED CURVE OF CONCERN
    REICHMAN, LB
    AMERICAN REVIEW OF RESPIRATORY DISEASE, 1991, 144 (04): : 741 - 742
  • [49] ALCOHOL AND THE U-SHAPED CURVE
    KAGAN, A
    YANO, K
    REED, DM
    LANCET, 1989, 1 (8631): : 224 - 225
  • [50] Variations on U-shaped learning
    Carlucci, L
    Jain, SA
    Kinber, E
    Stephan, F
    LEARNING THEORY, PROCEEDINGS, 2005, 3559 : 382 - 397