共 50 条
- [1] HIGH PIER AND LONG-SPAN CONTINUOUS RIGID FRAME BRIDGE CONSTRUCTION LINEAR CONTROL ANALYSIS [J]. PROCEEDINGS OF THE TWELFTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOLS I AND II, 2012, : 534 - 538
- [2] Monitor and Control on Effective Prestress of Typical Tendons for Long-Span Continuous Rigid Frame Bridge [J]. ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 1997 - +
- [3] Performance research on long-span RPC concrete continuous rigid frame bridge [J]. Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2009, 36 (04): : 6 - 12
- [4] Stability analysis of cantilever construction of the long-span rigid-frame bridge [J]. Advances in Structural Engineering:Theory and Applications Vols 1 and 2, 2006, : 2095 - 2099
- [5] Constraint system for a long-span continuous rigid frame bridge under earthquake [J]. Zhendong yu Chongji/Journal of Vibration and Shock, 2019, 38 (10): : 98 - 104
- [6] Analysis of rationality rigidity of piers for long-span continuous rigid frame bridge [J]. Wuhan Ligong Daxue Xuebao (Jiaotong Kexue Yu Gongcheng Ban)/Journal of Wuhan University of Technology (Transportation Science and Engineering), 2006, 30 (04): : 603 - 606
- [7] BEARING DAMAGE IDENTIFICATION STUDY OF LONG-SPAN CONTINUOUS RIGID FRAME BRIDGE [J]. PROCEEDINGS OF THE TWELFTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOLS I AND II, 2012, : 1566 - 1572
- [9] Study on construction control of long-span V-shape rigid frame composite arch bridge [J]. Gou, H. (gouhongye@163.com), 1600, Chinese Society of Civil Engineering (46):
- [10] Long span prestressed concrete continuous rigid-frame bridge ANN construction control [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 2261 - 2264