Long-span continuous rigid frame bridge construction control

被引:0
|
作者
Li, Jianqiao [1 ]
Yang, Yaxun [1 ]
Yang, Zhikui [1 ]
机构
[1] Changan Univ, Collage Highway, Xian, Peoples R China
关键词
Continuous rigid frame bridge; The cantilever construction; Linear control; Stress monitoring;
D O I
暂无
中图分类号
O414.1 [热力学];
学科分类号
摘要
Running is the cantilever method is adopted in the study of the construction of continuous rigid frame bridge construction monitoring. The bridge with high pier and large cross-border, narrow bridge deck and other characteristics, high construction requirement and great technical difficulties. According to these characteristics, an analysis of the mechanical characteristics of each construction stage. Establishing finite element model of each construction stage, compared with measured values of related parameters correction and error analysis. Thus established in this kind of bridge construction control, should be focusing on the deflection and stress monitoring, but also attaches great importance to the influence factors such as temperature, sunshine.
引用
收藏
页码:1316 / 1320
页数:5
相关论文
共 50 条
  • [1] HIGH PIER AND LONG-SPAN CONTINUOUS RIGID FRAME BRIDGE CONSTRUCTION LINEAR CONTROL ANALYSIS
    Liu, Changxi
    Shi, Aihong
    [J]. PROCEEDINGS OF THE TWELFTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOLS I AND II, 2012, : 534 - 538
  • [2] Monitor and Control on Effective Prestress of Typical Tendons for Long-Span Continuous Rigid Frame Bridge
    Guo, Qi
    He, Shuanhai
    Li, Qingning
    [J]. ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 1997 - +
  • [3] Performance research on long-span RPC concrete continuous rigid frame bridge
    Wang, Fei
    Fang, Zhi
    [J]. Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2009, 36 (04): : 6 - 12
  • [4] Stability analysis of cantilever construction of the long-span rigid-frame bridge
    Zhu, Ying-Lei
    [J]. Advances in Structural Engineering:Theory and Applications Vols 1 and 2, 2006, : 2095 - 2099
  • [5] Constraint system for a long-span continuous rigid frame bridge under earthquake
    Zhou, Mi
    Zhu, Guoqiang
    Wu, Jiang
    Lu, Wei
    Liu, Pingjun
    [J]. Zhendong yu Chongji/Journal of Vibration and Shock, 2019, 38 (10): : 98 - 104
  • [6] Analysis of rationality rigidity of piers for long-span continuous rigid frame bridge
    Wang, Junli
    He, Shuanhai
    [J]. Wuhan Ligong Daxue Xuebao (Jiaotong Kexue Yu Gongcheng Ban)/Journal of Wuhan University of Technology (Transportation Science and Engineering), 2006, 30 (04): : 603 - 606
  • [7] BEARING DAMAGE IDENTIFICATION STUDY OF LONG-SPAN CONTINUOUS RIGID FRAME BRIDGE
    Niu, Jie
    Chu, Fupeng
    Wang, Longhua
    Zong, Zhouhong
    [J]. PROCEEDINGS OF THE TWELFTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOLS I AND II, 2012, : 1566 - 1572
  • [8] Key Construction Control Techniques for Long-Span Continuous Rigid-Frame Bridge with Steel-Concrete Hybrid Girders
    Liu, De-Qing
    Wang, Wen-Yang
    [J]. Bridge Construction, 2021, 51 (01) : 121 - 129
  • [9] Study on construction control of long-span V-shape rigid frame composite arch bridge
    [J]. Gou, H. (gouhongye@163.com), 1600, Chinese Society of Civil Engineering (46):
  • [10] Long span prestressed concrete continuous rigid-frame bridge ANN construction control
    Ren, Geng Feng
    Zou, Cun Jun
    Xu, Yue
    [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 2261 - 2264