Key Construction Control Techniques for Long-Span Continuous Rigid-Frame Bridge with Steel-Concrete Hybrid Girders

被引:0
|
作者
Liu, De-Qing [1 ,2 ]
Wang, Wen-Yang [1 ,3 ]
机构
[1] State Key Laboratory for Health and Safety of Bridge Structures, Wuhan,430034, China
[2] Wuhan Bridge and Building Works Supervision Co., Ltd., Wuhan,430034, China
[3] China Railway Bridge Science Research Institute, Ltd., Wuhan,430034, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:121 / 129
相关论文
共 50 条
  • [1] Long span prestressed concrete continuous rigid-frame bridge ANN construction control
    Ren, Geng Feng
    Zou, Cun Jun
    Xu, Yue
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 2261 - 2264
  • [2] Long-span continuous rigid frame bridge construction control
    Li, Jianqiao
    Yang, Yaxun
    Yang, Zhikui
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON ADVANCED DESIGN AND MANUFACTURING ENGINEERING, 2015, 39 : 1316 - 1320
  • [3] Stability analysis of cantilever construction of the long-span rigid-frame bridge
    Zhu, Ying-Lei
    Advances in Structural Engineering:Theory and Applications Vols 1 and 2, 2006, : 2095 - 2099
  • [4] DESIGN AND MECHANICAL BEHAVIOR OF LONG-SPAN CONCRETE CONTINUOUS RIGID-FRAME BRIDGE WITH UNBALLASTED TRACK
    Wu, Fangwen
    Xue, Chengfeng
    Han, Yongli
    Zhao, Lei
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 793 - 796
  • [5] Investigation on Closure Temperature of Long-span Pre-stressed Concrete Continuous Rigid-frame Bridge
    Liao, Xiangsheng
    Liang, Tian
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1325 - +
  • [6] Parametric analysis on the stability of long-span rigid-frame bridge during cantilever construction
    School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China
    不详
    Zhongguo Tiedao Kexue, 2007, 2 (32-38):
  • [7] Parameter Sensitivity Analysis of Vertical Deflection for Long-Span Continuous Rigid-frame Bridge
    Zheng, Hengbin
    Yu, Xiaolin
    Hu, Junliang
    Yan, Quansheng
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 1500 - 1504
  • [8] Analysis of the ultimate load capacity for long-span continuous rigid-frame bridge prestressed concrete box beam
    Li, Hua
    Wang, Daobin
    Zeng, Qingyuan
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2000, 13 (01): : 38 - 43
  • [9] Deflection Control Method Study of Long-span PC Continuous Rigid-frame Highway Bridge Compared With Railway Bridge
    Wu, Xun
    Yue, Jianjun
    Huang, Xianzheng
    Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 933 - 936
  • [10] Performance research on long-span RPC concrete continuous rigid frame bridge
    Wang, Fei
    Fang, Zhi
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2009, 36 (04): : 6 - 12