Sustainability Management Model Based on Risk Analysis and Implementation of the Model

被引:3
|
作者
Coskun, Semih [1 ]
Akgul, Elif [1 ]
机构
[1] Pamukkale Univ, Fac Engn, Dept Ind Engn, TR-20160 Denizli, Turkey
关键词
sustainability; process management; risk analysis; management by goals; fuzzy failure mode and effects analysis;
D O I
10.3390/su14084396
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In modern business management, the effective management of organizational structures based on goals within the scope of modern management concepts, as well as the continuous improvement of processes for increasing competitiveness, are critical. The purpose of this study is to discuss the matter of risk identification and analysis, practices that are seen in many different fields within the scope of the notion of sustainable management. It aimed to add the dimensions of targets and risk analysis to the scope of process analysis and development, within this study. The stages, starting with the definition of the processes in the process model through the targets based on the risk analysis, are transformed into a quality assurance cycle and completed with the determination, monitoring, and evaluation of the sustainable process development activities. The performance indicators of the business processes in a textile business were determined, and the identification of a model structure with systematic traceability was provided, in practice. The opportunities and threats encountered in achieving the determined goals were identified. The defined factors were examined within the scope of the failure mode and effects analysis and risk analysis methods. The risk evaluations were performed using fuzzy numbers. The results obtained by fuzzy failure mode effects analysis were evaluated through the MATLAB Fuzzy Logic Design Toolbox model. Risks were ranked as a result of the evaluation, and process development activities were chosen.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] A Bibliometric Analysis of Sustainability and Risk Management
    Nobanee, Haitham
    Al Hamadi, Fatima Youssef
    Abdulaziz, Fatma Ali
    Abukarsh, Lina Subhi
    Alqahtani, Aysha Falah
    AlSubaey, Shayma Khalifa
    Alqahtani, Sara Mohamed
    Almansoori, Hamama Abdulla
    SUSTAINABILITY, 2021, 13 (06)
  • [22] AN IMPLEMENTATION OF A MODEL MANAGEMENT SYSTEM
    Chen Xiaohong(Department of Business Administration Central South University of Technology
    Transactions of Nonferrous Metals Society of China, 1995, (04) : 151 - 157
  • [23] An implementation of a model management system
    Chen, XH
    Takahara, Y
    TRANSACTIONS OF NONFERROUS METALS SOCIETY OF CHINA, 1995, 5 (04) : 151 - 157
  • [24] A quantitative model of sustainability risk in finance
    Kanamura, Takashi
    JOURNAL OF COMMODITY MARKETS, 2025, 37
  • [25] A Bayesian network model for container shipping companies' organisational sustainability risk management
    Zhou, Yusheng
    Yuen, Kum Fai
    TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2024, 126
  • [26] The IS risk analysis based on a business model
    Suh, B
    Han, I
    INFORMATION & MANAGEMENT, 2003, 41 (02) : 149 - 158
  • [27] A Process Model of Risk Management in the System of Management of Strategic Sustainability of Cargo Motor Transport Enterprises
    Semin, Valery G.
    Grigoreva, Svetlana V.
    Dmitrieva, Tatiana V.
    Ilyina, Ekaterina A.
    PROCEEDINGS OF THE 2016 IEEE CONFERENCE ON QUALITY MANAGEMENT, TRANSPORT AND INFORMATION SECURITY, INFORMATION TECHNOLOGIES (IT&MQ&IS), 2016,
  • [28] Sharing risk management: an implementation model for cardiovascular absolute risk assessment and management in Australian general practice
    Wan, Q.
    Harris, M. F.
    Zwar, N.
    Vagholkar, S.
    INTERNATIONAL JOURNAL OF CLINICAL PRACTICE, 2008, 62 (06) : 905 - 911
  • [29] Analysis of financial risk management based on fuzzy bp neural network model
    Zhang, Liu (liuzhang2726@163.com), 1600, Universidad Central de Venezuela (55):
  • [30] Capability maturity model for risk management in ERP/ERPII implementation project
    Wang Huifen
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, 2008, : 143 - 147