Bi-objective hybrid flow shop scheduling with common due date

被引:12
|
作者
Li, Zhi [1 ,2 ]
Zhong, Ray Y. [2 ]
Barenji, Ali Vatankhah [1 ]
Liu, J. J. [1 ]
Yu, C. X. [3 ]
Huang, George Q. [2 ]
机构
[1] Guangdong Univ Technol, Sch Electromech Engn, Guangdong Prov Key Lab Comp Integrated Mfg Syst, Guangzhou 510006, Peoples R China
[2] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Pokfulam Rd, Hong Kong, Peoples R China
[3] China Univ Petr, Acad Chinese Energy Strategy, 18 Fuxue Rd, Beijing 102249, Peoples R China
基金
中国国家自然科学基金;
关键词
Hybrid flow shop scheduling; Multi-objective; Genetic algorithm; Common due date; GENETIC ALGORITHM; NSGA-II; SEARCH; 2-STAGE;
D O I
10.1007/s12351-019-00470-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, the problem of hybrid flow shop scheduling with common due dates (HFSCDD) is studied, and the objectives are to minimize the total waiting time and the total earliness/tardiness issues that arise. This study was motivated by a real-life shop floor, with the predefined goal of meeting the requirements of the final product in many manufacturing industries. Where the final product is assembled from multiple components and, the assembly is only initiated when all components of the product are complete in number. These interrelated components have common due dates. In this study, we developed a mathematical model of HFSCDD which made up of "n" jobs that were processed in "m" machines, located on "I" stages by taking into consideration the common due dates. This problem is classified as being NP-hard, and so an efficient modified genetic algorithm is developed to solve it. The proposed modify GA is developed based on the NSGA II method for large sized problems. The results of the proposed algorithm have been compared with PSO and GA algorithms and showed that the proposed algorithm achieved better performance than existing solutions, since the waiting time and the earliness/tardiness are significantly reduced. This is facilitated by the simultaneous production of components for the same product.
引用
收藏
页码:1153 / 1178
页数:26
相关论文
共 50 条
  • [1] Bi-objective hybrid flow shop scheduling with common due date
    Zhi Li
    Ray Y. Zhong
    Ali Vatankhah Barenji
    J. J. Liu
    C. X. Yu
    George Q. Huang
    [J]. Operational Research, 2021, 21 : 1153 - 1178
  • [2] Bi-objective hybrid flow shop scheduling: a new local search
    Mousavi, S. M.
    Mousakhani, M.
    Zandieh, M.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (5-8): : 933 - 950
  • [3] Bi-objective hybrid flow shop scheduling: a new local search
    S. M. Mousavi
    M. Mousakhani
    M. Zandieh
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 64 : 933 - 950
  • [4] The Effect of Worker Learning on Scheduling Jobs in a Hybrid Flow Shop: A Bi-Objective Approach
    Pargar, Farzad
    Zandieh, Mostafa
    Kauppila, Osmo
    Kujala, Jaakko
    [J]. JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2018, 27 (03) : 265 - 291
  • [5] Bi-objective scheduling for reentrant hybrid flow shop using Pareto genetic algorithm
    Cho, Hang-Min
    Bae, Suk-Joo
    Kim, Jungwuk
    Jeong, In-Jae
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (03) : 529 - 541
  • [6] The Effect of Worker Learning on Scheduling Jobs in a Hybrid Flow Shop: A Bi-Objective Approach
    Farzad Pargar
    Mostafa Zandieh
    Osmo Kauppila
    Jaakko Kujala
    [J]. Journal of Systems Science and Systems Engineering, 2018, 27 : 265 - 291
  • [7] Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines
    Malhotra, K.
    Gupta, D.
    Goel, S.
    Tripathi, A. K.
    [J]. MALAYSIAN JOURNAL OF MATHEMATICAL SCIENCES, 2022, 16 (03): : 451 - 470
  • [8] Inventory Based Bi-Objective Flow Shop Scheduling Model and Its Hybrid Genetic Algorithm
    Qing-dao-er-ji, Ren
    Wang, Yuping
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [9] Bi-objective optimization for Scheduling and Multi-skilled Worker Assignments in the Hybrid Flow Shop
    Liu, Ming
    Yang, Xuenan
    [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 2128 - 2133
  • [10] Security based bi-objective flow shop scheduling model and its hybrid genetic algorithm
    Qing-Dao-er-Ji, Ren
    Wang, Yuping
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2014, 243 : 637 - 643