Bi-objective hybrid flow shop scheduling: a new local search

被引:11
|
作者
Mousavi, S. M. [1 ]
Mousakhani, M. [2 ]
Zandieh, M. [3 ]
机构
[1] Islamic Azad Univ, Fac Ind Engn, Dept Tech Engn, Noshahr Branch, Noshahr, Iran
[2] Islamic Azad Univ, Dept Business Management, Fac Management & Econ, Sci & Res Branch, Tehran, Iran
[3] Shahid Beheshti Univ, Management & Accounting Fac, Dept Ind Management, GC, Tehran, Iran
关键词
Bi-objective scheduling; Hybrid flow shop; Free disposal hull approach; Local search; Triangle method; GENETIC ALGORITHM; SETUP TIMES; CRITERIA; 2-STAGE;
D O I
10.1007/s00170-012-4067-6
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we have considered the bi-objective hybrid flow shop scheduling problem with the objectives of minimizing makespan and minimizing total tardiness. The problem is, however, a combinatorial optimization problem which is too difficult to be solved optimally, and hence, heuristics are used to obtain good solutions in a reasonable time. On the other hand, local search is a method for solving computationally hard optimization problems. Hence, we introduce a novel bi-objective local search algorithm (BOLS) to solve the problem efficiently. This local search can perform an effective search in three phases. In the initial phase, the assigned job set of a machine is moved to other machines. In the second phase, the order of jobs is changed for a machine. Finally, in phase 3, a process is done to change the assigned job set of a machine and order of jobs for a machine simultaneously. A measure of performance in literature namely free disposal hull approach and a new technique proposed by authors called "triangle method" have been used to evaluate the quality of the obtained solutions. The experimental results of the comparison between the proposed algorithm and several effective algorithms show that the BOLS is attractive for solving the bi-objective scheduling problem.
引用
收藏
页码:933 / 950
页数:18
相关论文
共 50 条
  • [1] Bi-objective hybrid flow shop scheduling: a new local search
    S. M. Mousavi
    M. Mousakhani
    M. Zandieh
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 64 : 933 - 950
  • [2] Bi-objective hybrid flow shop scheduling with common due date
    Li, Zhi
    Zhong, Ray Y.
    Barenji, Ali Vatankhah
    Liu, J. J.
    Yu, C. X.
    Huang, George Q.
    [J]. OPERATIONAL RESEARCH, 2021, 21 (02) : 1153 - 1178
  • [3] Bi-objective hybrid flow shop scheduling with common due date
    Zhi Li
    Ray Y. Zhong
    Ali Vatankhah Barenji
    J. J. Liu
    C. X. Yu
    George Q. Huang
    [J]. Operational Research, 2021, 21 : 1153 - 1178
  • [4] The Effect of Worker Learning on Scheduling Jobs in a Hybrid Flow Shop: A Bi-Objective Approach
    Pargar, Farzad
    Zandieh, Mostafa
    Kauppila, Osmo
    Kujala, Jaakko
    [J]. JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2018, 27 (03) : 265 - 291
  • [5] Bi-objective scheduling for reentrant hybrid flow shop using Pareto genetic algorithm
    Cho, Hang-Min
    Bae, Suk-Joo
    Kim, Jungwuk
    Jeong, In-Jae
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (03) : 529 - 541
  • [6] The Effect of Worker Learning on Scheduling Jobs in a Hybrid Flow Shop: A Bi-Objective Approach
    Farzad Pargar
    Mostafa Zandieh
    Osmo Kauppila
    Jaakko Kujala
    [J]. Journal of Systems Science and Systems Engineering, 2018, 27 : 265 - 291
  • [7] Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines
    Malhotra, K.
    Gupta, D.
    Goel, S.
    Tripathi, A. K.
    [J]. MALAYSIAN JOURNAL OF MATHEMATICAL SCIENCES, 2022, 16 (03): : 451 - 470
  • [8] A Self-braking Symbiotic Organisms Search Algorithm for Bi-objective Reentrant Hybrid Flow Shop Scheduling Problem
    Cao, Zhengcai
    Gong, Sikai
    Zhou, Meng
    Liu, Kaiwen
    [J]. 2018 IEEE 14TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2018, : 803 - 808
  • [9] Inventory Based Bi-Objective Flow Shop Scheduling Model and Its Hybrid Genetic Algorithm
    Qing-dao-er-ji, Ren
    Wang, Yuping
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [10] Bi-objective optimization for Scheduling and Multi-skilled Worker Assignments in the Hybrid Flow Shop
    Liu, Ming
    Yang, Xuenan
    [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 2128 - 2133