Reliability buffering for construction projects

被引:39
|
作者
Park, M [1 ]
Peña-Mora, F
机构
[1] Natl Univ Singapore, Dept Bldg, Sch Design & Environm, Singapore 117548, Singapore
[2] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
关键词
reliability; buffeting; simulation; construction management; project management;
D O I
10.1061/(ASCE)0733-9364(2004)130:5(626)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Buffering is a common practice in project planning. Project managers or schedulers have used a time contingency to guarantee the completion time of either an activity or a project. This traditional buffering, however, often fails to protect the project schedule performance, resulting in an unnecessary resource idle time. To deal with this problem, reliability buffering, a simulation-based buffering strategy, is presented. Reliability buffering aims to generate a robust construction plan that protects against uncertainties by reducing the potential impact of construction changes. The effectiveness of reliability buffering is examined by simulating a dynamic project model that integrates the simulation approach with the network scheduling approach. The research results indicate that reliability buffering can help achieve a shorter project duration without driving up costs by pooling, resizing, relocating, and recharacterizing contingency buffers. A case study of bridge construction projects also demonstrates how construction projects can benefit from reliability buffering in real world settings. Although further validation is needed, reliability buffering can potentially impact the planning and control of construction projects by improving the consideration of construction feedbacks and characteristics in buffering, and serving as an input to a dynamic project model.
引用
下载
收藏
页码:626 / 637
页数:12
相关论文
共 50 条
  • [31] Social cost in construction projects
    Celik, Tolga
    Kamali, Saeed
    Arayici, Yusuf
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2017, 64 : 77 - 86
  • [32] Quality Management in Construction Projects
    Coffey, Vaughan
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2011, 29 (12) : 1244 - 1246
  • [33] EVALUATION METHODS FOR CONSTRUCTION PROJECTS
    Park, Moonseo
    Chu, Yongsik
    Lee, Hyun-Soo
    Kim, Wooyoung
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2009, 15 (04) : 349 - 359
  • [34] Organizational Ambidexterity in Construction Projects
    Eriksson, P. E.
    Szentes, H.
    2014 IEEE INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY (ICMIT 2014), 2014, : 81 - +
  • [35] Construction documents for historic projects
    Haney, Craig K.
    Construction Specifier, 2002, 55 (10):
  • [36] CONTROL OF PROJECTS DURING CONSTRUCTION
    NINOS, GE
    WEARNE, SH
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1986, 80 : 931 - 943
  • [37] Value Management of Construction Projects
    Chapman, Rob
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (03) : 339 - 340
  • [38] Concepts of Risk In Construction Projects
    Ghaffari, Alireza
    ADVANCES IN APPLIED MATERIALS AND ELECTRONICS ENGINEERING II, 2013, 684 : 644 - 649
  • [39] Sustainable construction projects awarded
    不详
    ZKG INTERNATIONAL, 2006, 59 (01): : 15 - 16
  • [40] CONSTRUCTION PROJECTS - KNOW THE RISKS
    PERRY, JG
    HAYES, RW
    CME-CHARTERED MECHANICAL ENGINEER, 1985, 32 (02): : 42 - 45