Evaluation of labor hiring policies in construction projects performance using system dynamics

被引:9
|
作者
Abbaspour, Soroush [1 ]
Dabirian, Shahin [2 ]
机构
[1] Islamic Azad Univ, Dept Construct Engn & Management, Isfahan Khorasgan Branch, Esfahan, Iran
[2] Art Univ Isfahan, Dept Architecture, Esfahan, Iran
关键词
Performance management; Human resource management; Construction projects; System dynamics; Earned value management; Labour hiring policies; STRATEGIC MANAGEMENT; RESOURCE-MANAGEMENT; MODEL;
D O I
10.1108/IJPPM-03-2019-0134
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose The purpose of this paper is to assess different labor hiring policies for construction projects using system dynamics (SD) which have a considerable impact on project performance. Time intervals and work crew composition are two such policies. Through the implementation of a variety of policies, a managerial opportunity presents itself for the effective allocation of human resources and improvement in project performance. Design/methodology/approach The study developed a dynamic model to assess different labor hiring policies using SD based on literature. To further distinguish between findings, the effects of the applied policies on performance were considered using earned value management. Based on a real case for validating the model, the paper discusses the potential benefits of the model, including: having a systematic and holistic view, considering dynamic the labor need and allocation, identifying alternative strategies for performance improvement and simulating the reality of the projects in a virtual model. Findings The achieved simulation results show how different hiring policies affect project performance. This research model can aid decision makers to assess labor hiring policies in various time intervals with different compositions and assist them in selecting the best policies for effective implementation of project. Originality/value The proposed model would be a major attempt using SD to model labor hiring policies more accurate in construction projects performance. In fact, an accurate estimate of labor needed, along with the proper planning and implementing of various labor hiring policies, presents a managerial opportunity whereby the effective allocation of workforces can be optimized leading to drastic improvement in project performance.
引用
收藏
页码:22 / 43
页数:22
相关论文
共 50 条
  • [21] Simulation of design changes impact in healthcare construction projects using system dynamics
    Saad, Dina A.
    Gharib, Farouk
    El-Said, Moheeb
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2021, 48 (05) : 554 - 569
  • [22] SYSTEM DYNAMICS FOR EVALUATION OF PUBLIC POLICIES
    Ruiz, Maria
    Zabaleta, Noemi
    Ignacio Igartua, Juan
    [J]. ICERI2016: 9TH INTERNATIONAL CONFERENCE OF EDUCATION, RESEARCH AND INNOVATION, 2016, : 7669 - 7677
  • [23] Development of an Evaluation System for Intelligent Construction Using System Dynamics Modeling
    Guan, Jing
    Liu, Boyang
    Shen, Wenxin
    [J]. BUILDINGS, 2024, 14 (06)
  • [24] RESEARCH ON THE RUNNING MECHANISM AND PERFORMANCE EVALUATION OF CONSTRUCTION AGENT SYSTEM IN GOVERNMENT INVESTMENT PROJECTS
    Bai, Shengling
    Jing, Chao
    Ye, Zhengan
    Lu, Chenyao
    [J]. ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 248 - 254
  • [25] Using software to monitor performance in construction projects
    Christian, J
    Cariappa, A
    [J]. COMPUTER TECHNIQUES FOR CIVIL AND STRUCTURAL ENGINEERING, 1999, : 229 - 233
  • [26] Reducing construction waste in the construction life cycle of industrial projects during design phase by using system dynamics
    Meshref, Ahmed Nouh
    Elkasaby, ELsayed Abdel Fattah Ahmed
    Farid, Ahmed Abdel Kader Mohamed
    [J]. JOURNAL OF BUILDING ENGINEERING, 2023, 69
  • [27] Estimating labor resource requirements in construction projects using machine learning
    Golabchi, Hamidreza
    Hammad, Ahmed
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2024, 24 (04): : 1048 - 1065
  • [28] SYSTEM DYNAMICS MODELING OF THE CONSTRUCTION SUPPLY CHAIN IN INDUSTRIAL MODULARIZED CONSTRUCTION PROJECTS
    Wu, Lingzi
    AbouRizk, Simaan
    Li, Kunkun
    [J]. 2022 WINTER SIMULATION CONFERENCE (WSC), 2022, : 2409 - 2420
  • [29] Practical solutions for improving the suboptimal performance of construction projects using Dubai construction projects as an example
    Omar, Hany
    Mahdjoubi, Lamine
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (06) : 2185 - 2205
  • [30] System Dynamics Evaluation of Renewable Energy Policies
    Trappey, Charles V.
    Trappey, Amy J. C.
    Lin, Gilbert Y. P.
    Chang, Yu-Sheng
    [J]. IMPROVING COMPLEX SYSTEMS TODAY, 2011, : 133 - 140