Sequencing problem for a mixed-model assembly line in the Toyota production system

被引:31
|
作者
Kotani, S
Ito, T
Ohno, K
机构
[1] Toyota Motor Co Ltd, Corp IT Div, Aichi 4718571, Japan
[2] Nagoya Inst Technol, Dept Syst Engn, Nagoya, Aichi 466, Japan
关键词
D O I
10.1080/0020754042000270377
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper discusses a sequencing problem of a mixed-model assembly line in the Toyota Motor Corporation production system, which is well known as the Just-in-Time production system. Whenever a worker in the assembly line finds that he might fail to complete his operations within the work zone, he pushes a button to call an auxiliary worker who assists him in the operations. If he can complete the operations within his work zone with the help of the auxiliary worker, the line does not stop. Otherwise, the line stops. In the Toyota production system, it is very important to keep a constant rate of usage of every part used by the assembly line. Hence, there are two goals for the sequencing problem in the Toyota production system. The paper provides a new formulation for the sequencing problem with two goals. It considers the goal of keeping the constant rate of part usage as a constraint of the sequencing problem, and it formulates a sequencing problem of minimizing the total line stoppage time with auxiliary workers and the constraints for keeping the constant rate of part usage. Since this problem is NP-hard and the size of the practical problems at Toyota are huge, a two-phase approximation algorithm is proposed. Numerical examples show that the proposed algorithm is efficient and can find a good suboptimal solution.
引用
收藏
页码:4955 / 4974
页数:20
相关论文
共 50 条
  • [41] Study on multiple objects optimization of mixed-model assembly sequencing problem
    Huang, Gang
    Shao, Xinyu
    Rao, Yunqing
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2007, 35 (10): : 84 - 86
  • [42] Development of search method for sequencing problem in mixed-model assembly lines
    Ishigaki, Aya
    Miyashita, Tomoyuki
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2016, 10 (03):
  • [43] Sequencing rules in the Mixed Model Assembly Line Sequencing Problem
    Maheut, Julien
    Pedro Garcia-Sabater, Jose
    WPOM-WORKING PAPERS ON OPERATIONS MANAGEMENT, 2015, 6 (02): : 38 - 47
  • [44] A hybrid multi-objective particle swarm algorithm for a mixed-model assembly line sequencing problem
    Rahimi-Vahed, A. R.
    Mirghorbani, S. M.
    Rabbani, M.
    ENGINEERING OPTIMIZATION, 2007, 39 (08) : 877 - 898
  • [45] A new particle swarm algorithm for a multi-objective mixed-model assembly line sequencing problem
    A. R. Rahimi-Vahed
    S. M. Mirghorbani
    M. Rabbani
    Soft Computing, 2007, 11 : 997 - 1012
  • [46] A new particle swarm algorithm for a multi-objective mixed-model assembly line sequencing problem
    Rahimi-Vahed, A. R.
    Mirghorbani, S. M.
    Rabbani, M.
    SOFT COMPUTING, 2007, 11 (10) : 997 - 1012
  • [47] Research on sequencing of mixed-model assembly line and logistics system modeling in automobile composite assembly distribution center
    Zhang, Xinwei
    Liu, Yanhui
    Zhou, Xiaoguang
    2018 INTERNATIONAL CONFERENCE ON ADVANCED MECHATRONIC SYSTEMS (ICAMECHS), 2018, : 72 - 77
  • [48] A Lagrangean relaxation approach for the mixed-model flow line sequencing problem
    Eliiyi, Deniz Tuersel
    Oezlen, Melih
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (03) : 933 - 943
  • [49] SEQUENCING JIT MIXED-MODEL ASSEMBLY LINES
    INMAN, RR
    BULFIN, RL
    MANAGEMENT SCIENCE, 1991, 37 (07) : 901 - 904
  • [50] A STUDY ON SEQUENCING METHOD FOR THE MIXED-MODEL ASSEMBLY-LINE IN JUST-IN-TIME PRODUCTION SYSTEMS
    XU, ZQ
    SHUSAKU, H
    COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 27 (1-4) : 225 - 228