Risk-based performance evaluation for concrete bridge deck repair

被引:0
|
作者
Huang, H. [1 ]
Liu, M. [1 ]
机构
[1] Relcon Infrastruct Management Inc, Denver, CO USA
关键词
RELIABILITY-ANALYSIS; BUILDINGS ACI-318; DESIGN CODE; CALIBRATION;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Repair of concrete decks has a significant impact on the total costs of a bridge repair and rehabilitation project. Therefore, it is important to establish a rational procedure and criteria for evaluating deck performance. This paper compares the evaluation procedures and performance criteria in the 2014 Canadian Highway Bridge Design Code with those in the Manual for Bridge Evaluation published by AASHTO in 2011. The fundamental differences between bridge design and evaluation have been identified, followed by a proposed evaluation procedure, where the risks related to the time-dependent uncertainties associated with concrete deterioration and the epistemic uncertainties in measurement and testing methods, including spatial variations, are considered. The proposed procedure is calibrated using a similar procedure for new structure design. More importantly, this paper emphasizes that new bridge design deals with group characteristics of future structures, while bridge evaluation addresses the status of individual elements in existing structures.
引用
收藏
页码:1161 / 1168
页数:8
相关论文
共 50 条
  • [41] Damage Evaluation for Concrete Bridge Deck by Means of Stress Wave Techniques
    Shiotani, Tomoki
    Ohtsu, Hiroyasu
    Momoki, Shohei
    Chai, Hwa Kian
    Onishi, Hiroshi
    Kamada, Toshiro
    JOURNAL OF BRIDGE ENGINEERING, 2012, 17 (06) : 847 - 856
  • [42] Polyester concrete for bridge deck overlays
    O'Connor, D.N.
    Saiidi, M.
    Concrete International, 1993, 15 (12) : 36 - 39
  • [43] Cracking Tendency of Bridge Deck Concrete
    Byard, Benjamin E.
    Schindler, Anton K.
    Barnes, Robert W.
    Rao, Akash
    TRANSPORTATION RESEARCH RECORD, 2010, (2164) : 122 - 131
  • [44] Risk-based evaluation of main suspension cables of the Forth Road Bridge in Scotland
    Mahmoud, K.
    Gair, C.
    McDonald, H.
    RISK-BASED BRIDGE ENGINEERING, 2019, : 3 - 15
  • [45] Risk-based bridge scour management: A survey
    Pregnolato, M.
    Vardanega, P. J.
    Limongelli, M. P.
    Giordano, P. F.
    Prendergast, L. J.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, LIFE-CYCLE SUSTAINABILITY AND INNOVATIONS, 2021, : 693 - 701
  • [46] Verification of the Framework for Risk-Based Bridge Inspection
    Washer, Glenn
    Connor, Robert
    Nasrollahi, Massoud
    Reising, Rebecca
    JOURNAL OF BRIDGE ENGINEERING, 2016, 21 (04)
  • [47] Performance-based safety evaluation of concrete beam bridge
    Wang, Q.
    Li, R.
    Wang, C. S.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION, 2014, : 1256 - 1264
  • [48] ALTERNATE BIDS FOR BRIDGE DECK REPAIR
    TRAPANI, RJ
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1978, 104 (02): : 133 - 139
  • [49] Performance evaluation of precast posttensioned concrete multibeam deck
    Badwan, Inmar Z.
    Liang, Robert Y.
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2007, 21 (05) : 368 - 374
  • [50] Risk-based design of bridge scour countermeasures
    Pearson, DR
    Jones, JS
    Stein, SM
    FIFTH INTERNATIONAL BRIDGE ENGINEERING CONFERENCE, VOLS 1 AND 2: BRIDGES, OTHER STRUCTURES, AND HYDRAULICS AND HYDROLOGY, 2000, 1696 : A229 - A235