Long-Term Monitoring of the Effectiveness of a Ground Source Heat Pump Borehole

被引:1
|
作者
Rubinova, Olga [1 ]
Ambrozova, Iva [1 ]
Horak, Petr [1 ]
机构
[1] Brno Univ Technol, Fac Civil Engn, Brno 60200, Czech Republic
来源
ENVIBUILD 2014 | 2014年 / 1041卷
关键词
Borehole eat Pump; Thermal Performance; Substrate Cooling; Primary and Secondary Side of the Heat Pump; EXCHANGERS; PERFORMANCE;
D O I
10.4028/www.scientific.net/AMR.1041.125
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this study, we evaluate the qualitative thermal performance of a groundwater borehole by monitoring the temperature at the primary (borehole) and secondary (heat pump) sides of a domestic heat pump over three heating seasons between 2010 and 2013. Based on early results, the borehole was extended during the monitoring period in order to increase performance. Our results suggest that the temperature parameters of a borehole do not remain constant and that a borehole's properties can change significantly over time if the borehole substrate temperature is not given time to regenerate.
引用
收藏
页码:125 / 128
页数:4
相关论文
共 50 条
  • [1] Long-term monitoring and performance of ground source heat pumps
    Stafford, A.
    [J]. BUILDING RESEARCH AND INFORMATION, 2011, 39 (06): : 566 - 573
  • [2] Long-term operation analysis of a ground source heat pump with an air source heat pump as an auxiliary heat source in a warm region
    Kaneko, Chika
    Yoshinaga, Mika
    [J]. ENERGY AND BUILDINGS, 2023, 289
  • [3] Forecast and analysis of long-term operation of ground source heat pump system
    Qi, Zi-Shu
    Gao, Qing
    Yu, Ming
    Liu, Yan
    Bai, Li
    [J]. Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2012, 42 (04): : 877 - 881
  • [4] LONG TERM SIMULATION OF HORIZONTAL GROUND HEAT EXCHANGER FOR GROUND SOURCE HEAT PUMP
    Kayaci, Nurullah
    Demir, Hakan
    Atayilmaz, S. Ozgur
    Agra, Ozden
    [J]. PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2015, VOL 6B, 2016,
  • [5] Effect of borehole short-time-step performance on long-term dynamic simulation of ground-source heat pump system
    Lee, C. K.
    [J]. ENERGY AND BUILDINGS, 2016, 129 : 238 - 246
  • [6] Influencing factors analysis and operation optimization for the long-term performance of medium-deep borehole heat exchanger coupled ground source heat pump system
    Liu, Jun
    Wang, Fenghao
    Gao, Yuan
    Zhang, Yuping
    Cai, Wanlong
    Wang, Ming
    Wang, Zhihua
    [J]. ENERGY AND BUILDINGS, 2020, 226
  • [7] Influence of pipe length design method on long-term performance of ground source heat pump
    Zhang, Hongzhi
    Han, Zongwei
    Yang, Lingyan
    Li, Jintang
    [J]. Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2021, 52 (06): : 1846 - 1853
  • [8] An integrated predictive model of the long-term performance of ground source heat pump (GSHP) systems
    Li, Wenxin
    Li, Xiangdong
    Wang, Yong
    Tu, Jiyuan
    [J]. ENERGY AND BUILDINGS, 2018, 159 : 309 - 318
  • [9] Case study of the long-term stability and strategy optimization of a ground source heat pump system
    Guo, Hongxian
    Wang, Tianlin
    Cheng, Xiaohui
    Guan, Wen
    Zhao, Yong
    Yang, Jun
    Li, Jianmin
    Liu, Zheng
    [J]. Qinghua Daxue Xuebao/Journal of Tsinghua University, 2024, 64 (05): : 801 - 809
  • [10] Long term coupled simulation for ground source heat pump and underground heat exchangers
    Li, Shuhong
    Dong, Kefeng
    Wang, Jinyong
    Zhang, Xiaosong
    [J]. ENERGY AND BUILDINGS, 2015, 106 : 13 - 22