Study on the propagation law of tunnel blasting vibration in stratum and blasting vibration reduction technology

被引:120
|
作者
Tian, Xiaoxu [1 ,2 ]
Song, Zhanping [1 ,2 ]
Wang, Junbao [1 ,2 ]
机构
[1] Xian Univ Architecture & Technol, Sch Civil Engn, Xian 710055, Shaanxi, Peoples R China
[2] Xian Univ Architecture & Technol, Shaanxi Key Lab Geotech & Underground Space Engn, Xian 710055, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
Tunnel; Blasting vibration; Observed data; Signal analysis; Vibration reduction scheme; GROUND VIBRATION; ROCK; SIGNAL; IMPACT; MINE;
D O I
10.1016/j.soildyn.2019.105813
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
In order to explore the propagation law of blasting vibration velocity in strata and reduce the damage caused by blasting vibration to buildings, a series of blasting vibration tests were carried out in this paper based on the Dizong tunnel project. The affected area of tunnel blasting was divided into four areas according to observed data, respectively, the dangerous zone, the warning zone, the blasting control zone, and the safe zone. The power spectral, wavelet-energy, wavelet packet energy analysis, and other signal processing were programmed with the help of MATLAB to analyze the propagation law of blasting vibration of super-large section shallow tunnel in the stratum. The results show that the maximum particle vibration velocity at the ground surface decreased with distance. The particle vibration velocity in the z-direction was larger than that in the horizontal direction. The energy of blasting vibration mainly came from the explosion in the first cut blasting. Based on the monitoring data and vibration signal analysis, a blasting vibration reduction scheme was put forward. The maximum particle vibration velocity caused by this scheme was controlled at 1.12 cm/s, and the main frequency of blasting vibration was much higher than the natural vibration frequency of the building. The blasting vibration reduction scheme could control the delayed release of blasting energy and realize the vibration missing peak of blasting vibration, which could provide a reference for similar engineering construction in the future.
引用
下载
收藏
页数:12
相关论文
共 50 条
  • [41] Blasting vibration safety criterion for a tunnel liner structure
    Jiang, Nan
    Zhou, Chuanbo
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 32 : 52 - 57
  • [42] Blasting Excavation and Vibration Monitoring Design for Diversion Tunnel
    Hu, Qigao
    Cui, WeiFeng
    Gao, Jingwei
    Zhao, Feiwei
    Liang, Qianfu
    ADVANCES IN CIVIL INFRASTRUCTURE ENGINEERING, PTS 1 AND 2, 2013, 639-640 : 969 - +
  • [43] Blasting vibration response and safety control of mountain tunnel
    Renliang Shan
    Yan Zhao
    HaiLong Wang
    Zhongfei Liu
    Huifeng Qin
    Bulletin of Engineering Geology and the Environment, 2023, 82
  • [44] The Stability of Highway Tunnel Lining under Blasting Vibration
    Yang De-qiang
    Ji Yu-cheng
    Liu Jia
    Wang Yang
    Wang Xu-guang
    Chi En-an
    Zhao Ming-sheng
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2016, 21 (09): : 3583 - 3594
  • [45] Numerical simulation of blasting vibration on existing tunnel extension
    Liu Dong
    Gao Wen-xue
    Sun Bao-ping
    Liu Dan-hui
    Zhou Shi-sheng
    ROCK AND SOIL MECHANICS, 2016, 37 (10) : 3011 - 3016
  • [46] Vibration measurements and modelling for blasting in a hard rock tunnel
    Spathis, A. T.
    Rothery, M.
    TUNNELLING IN ROCK BY DRILLING AND BLASTING, 2013, : 59 - 71
  • [47] Response spectrum of blasting vibration induced by tunnel excavation
    College of Water Resources and Hydropower, Sichuan University, Chengdu 610065, China
    不详
    Baozha Yu Chongji, 2008, 4 (331-335):
  • [48] Influence of blasting vibration on adjacent buildings of station tunnel
    Zhu, Ze-Bing
    Zhang, Yong-Xing
    Liu, Xin-Rong
    Zhao, Bao-Yun
    Chongqing Daxue Xuebao/Journal of Chongqing University, 2010, 33 (02): : 110 - 116
  • [49] Monitoring and analysis of blasting vibration in diversion tunnel excavation
    Deng Hua-feng
    Zhang Guo-dong
    Wang Le-hua
    Deng Cheng-jin
    Guo Jing
    Lu Tao
    ROCK AND SOIL MECHANICS, 2011, 32 (03) : 855 - 860
  • [50] Vibration response of an existing tunnel to adjacent blasting construction
    Zhou Y.
    Wang S.L.
    Wang J.
    Chemical Engineering Transactions, 2016, 55 : 31 - 36