共 50 条
- [21] Flow shop scheduling with deteriorating jobs under dominating machines to minimize makespan The International Journal of Advanced Manufacturing Technology, 2010, 48 : 719 - 723
- [22] Parallel-machine scheduling of deteriorating jobs with potential machine disruptions OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 69 : 17 - 28
- [24] Unrelated parallel-machine scheduling with deteriorating jobs and rejection INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY, PTS 1-4, 2013, 263-266 : 655 - 659
- [25] Flow shop scheduling with deteriorating jobs under dominating machines to minimize makespan INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (5-8): : 719 - 723
- [29] Single machine scheduling with deteriorating jobs 2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7654 - 7657
- [30] Scheduling linear deteriorating jobs to minimize the number of tardy jobs Journal of Global Optimization, 2012, 54 : 389 - 404