An improved feedback deadline assignment algorithm for real-time control tasks scheduling

被引:0
|
作者
Wang, Zhigang [1 ]
Wang, Wei [1 ]
Liu, Quanli [1 ]
机构
[1] Dalian Univ Technol, Res Ctr Informat & Control, Dalian 116023, Peoples R China
关键词
real-time control system; scheduling; jitter; earliest deadline first; PID;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A Feedback Control method of Deadline Assignment (FC-DA) is presented to reduce output jitter of control tasks. The prevailing PID control law is employed, whose parameters can be adaptively adjusted online according to CPU load and jitter. The schedulability of whole task set is guaranteed dynamically. A simulation experiment shows the improvement when compared with proportional-only law.
引用
收藏
页码:6724 / +
页数:2
相关论文
共 50 条
  • [31] Errata: A New Algorithm for Scheduling Periodic, Real-Time Tasks
    B. Kalyanasundaram
    K. R. Pruhs
    E. Torng
    [J]. Algorithmica, 2000, 28 : 269 - 270
  • [32] Optimal Scheduling Algorithm for Real-Time Tasks in Digital Control Systems Based On GA
    Liu Huai
    Huang Jian-xin
    Feng Chun-mei
    [J]. 2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 74 - 79
  • [33] A new real-time scheduling algorithm for continuous media tasks
    Yoo, MR
    Ahn, B
    Lee, DH
    Kim, HC
    [J]. 2001 IEEE PACIFIC RIM CONFERENCE ON COMMUNICATIONS, COMPUTERS AND SIGNAL PROCESSING, VOLS I AND II, CONFERENCE PROCEEDINGS, 2001, : 417 - 420
  • [34] Scheduling Algorithm for Parallel Real-Time Tasks on Multiprocessor Systems
    Kuo, Chin-Fu
    Lu, Yung-Feng
    [J]. APPLIED COMPUTING REVIEW, 2016, 16 (04): : 14 - 24
  • [35] Stretching algorithm for global scheduling of real-time DAG tasks
    Manar Qamhieh
    Laurent George
    Serge Midonnet
    [J]. Real-Time Systems, 2019, 55 : 32 - 62
  • [36] A Fuzzy Algorithm for Real-Time Scheduling of Soft Periodic Tasks
    Sabeghi, Mojtaba
    Naghibzadeh, Mahmoud
    [J]. INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2006, 6 (2A): : 227 - 236
  • [37] A feedback scheduling algorithm for real time control systems
    Yuan, P
    Moallem, M
    Patel, RV
    [J]. 2005 IEEE INTERNATIONAL CONFERENCE ON CONTROL APPLICATIONS (CCA), VOLS 1AND 2, 2005, : 873 - 878
  • [38] An Algorithm for Scheduling Aperiodic Real-time Tasks on a Static Schedule
    Yin, Jin-yong
    Guo, Guo-chang
    [J]. ICIC 2009: SECOND INTERNATIONAL CONFERENCE ON INFORMATION AND COMPUTING SCIENCE, VOL 1, PROCEEDINGS: COMPUTING SCIENCE AND ITS APPLICATION, 2009, : 70 - 74
  • [39] A genetic algorithm for scheduling tasks in a real-time distributed system
    Monnier, Y
    Beauvais, JP
    Deplanche, AM
    [J]. 24TH EUROMICRO CONFERENCE - PROCEEDING, VOLS 1 AND 2, 1998, : 708 - 714
  • [40] Stretching algorithm for global scheduling of real-time DAG tasks
    Qamhieh, Manar
    George, Laurent
    Midonnet, Serge
    [J]. REAL-TIME SYSTEMS, 2019, 55 (01) : 32 - 62