An ERNSGA-III algorithm for the production and distribution planning problem in the multiagent supply chain

被引:11
|
作者
Gharaei, Ali [1 ]
Jolai, Fariborz [2 ]
机构
[1] Univ Tehran, Coll Engn, Alborz Campus, Tehran, Iran
[2] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
基金
美国国家科学基金会;
关键词
supply chain; scheduling; multiagent; distribution; reference point; ERNSGA‐ III;
D O I
10.1111/itor.12654
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Nowadays, new issues have been emerged in industry by increasing the supply chain boundaries, especially when some supply chain members seek their own interests. In the literature, this case is referred to as a multiagent problem in which each agent has his/her own set of jobs and objectives. Here, an integrated production scheduling and distribution problem in a multisite supply chain is investigated from the three-agent perspective of the manufacturer, distributor, and customer. Due to the complexity of the problem, a novel evolutionary-based reference point determination of the third version of the non-dominated sorting genetic algorithm (ERNSGA-III) is proposed. In this algorithm, some modifications to the classic version of NSGA-III have been made and a novel reference point determination method based on Bees algorithm is used in the selection operation. Some statistical tests are performed to compare the proposed algorithm with three other algorithms in the literature. The results show that the proposed algorithm is more effective than other algorithms.
引用
收藏
页码:2139 / 2168
页数:30
相关论文
共 50 条
  • [21] An Integrated Production and Distribution Planning Model in Shrimp Agroindustry Supply Chain
    Herlina, Lely
    Machfud
    Anggraeni, Elisa
    Sukardi
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2022, 21 (01): : 1 - 19
  • [22] Production-distribution planning in supply chain using a hybrid approach
    Lee, YH
    Kim, SH
    Moon, C
    PRODUCTION PLANNING & CONTROL, 2002, 13 (01) : 35 - 46
  • [23] Integrated production/distribution planning in the supply chain: the Febal case study
    Nonino, Fabio
    Panizzolo, Roberto
    SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2007, 12 (02) : 150 - 163
  • [24] A Multiobjective Bilevel Program for Production-Distribution Planning in a Supply Chain
    Calvete, Herminia I.
    Gale, Carmen
    MULTIPLE CRITERIA DECISION MAKING FOR SUSTAINABLE ENERGY AND TRANSPORTATION SYSTEMS: PROCEEDINGS OF THE 19TH INTERNATIONAL CONFERENCE ON MULTIPLE CRITERIA DECISION MAKING, 2010, 634 : 155 - 165
  • [25] Production-distribution planning in supply chain considering capacity constraints
    Lee, YH
    Kim, SH
    COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 43 (1-2) : 169 - 190
  • [26] A Two Step Approach for the Integrated Production and Distribution Planning of a Supply Chain
    Tasan, Ali Serdar
    INTELLIGENT COMPUTING, PART I: INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTING, ICIC 2006, PART I, 2006, 4113 : 883 - 888
  • [27] An integrated supply chain production-distribution planning with stochastic demands
    Nasiri, G. Reza
    Zolfaghari, Rohollah
    Davoudpour, Hamid
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 77 : 35 - 45
  • [28] Integration of production and distribution planning (IPDP) in the supply chain: A literature review
    Machkour, Mohammed
    El Barakany, Abdellah
    Harras, Bilal
    2022 14TH INTERNATIONAL COLLOQUIUM OF LOGISTICS AND SUPPLY CHAIN MANAGEMENT (LOGISTIQUA2022), 2022, : 269 - 273
  • [29] Integrated production-distribution planning problem in a competition-based four-echelon supply chain
    Rafiei, Hamed
    Safaei, Fatemeh
    Rabbani, Masoud
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 119 : 85 - 99
  • [30] Optimization of the supply chain network planning problem using an improved genetic algorithm
    Zhao L.
    Xie J.
    International Journal for Simulation and Multidisciplinary Design Optimization, 2023, 14