The helium purification system of the HTR-10

被引:40
|
作者
Yao, MS [1 ]
Wang, RP [1 ]
Liu, ZY [1 ]
He, XD [1 ]
Li, J [1 ]
机构
[1] Tsing Hua Univ, Inst Nucl Energy Technol, Beijing 100084, Peoples R China
关键词
Helium purification systems;
D O I
10.1016/S0029-5493(02)00187-5
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In order to reduce the quantity of chemical impurities in the primary coolant helium and to remove the gaseous radionuclide fission products, a helium purification system mainly composed of a copper oxide bed, a molecular sieve adsorber and a low temperature adsorber is designed for the HTR-10. One actual purification train is designed for a helium flow rate of 10.5 kg h(-1), corresponding with a 5% gas change of the helium inventory in primary circuit. It is anticipated that more than 2000 h continuous purification operation will be reached between regeneration. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:163 / 167
页数:5
相关论文
共 50 条
  • [31] The primary loop confinement and pressure boundary system of the HTR-10
    He, SY
    Zhang, ZM
    Qin, ZY
    NUCLEAR ENGINEERING AND DESIGN, 2002, 218 (1-3) : 111 - 122
  • [32] HTR-10 primary cavity cooling system and its features
    Li, Huaixuan
    Zhang, Yajun
    Li, Zhongsan
    Qinghua Daxue Xuebao/Journal of Tsinghua University, 1998, 38 (05): : 99 - 101
  • [34] Commissioning of HTR-10 before fueling
    Su, Qing-Shan
    Wang, Rui-Pian
    Chen, Hua
    Hu, Shou-Yin
    Liang, Xi-Hua
    Sun, Shuan-Liang
    2001, Yuan Zi Neng Chuban She (22):
  • [35] HTR-10的燃料管理
    吴宗鑫
    经荥清
    清华大学学报(自然科学版), 2001, (自然科学版) : 120 - 123
  • [36] Influence of the ratio of curvature and diameter on the flow characteristics of helium in the 90° elbow of HTR-10
    Feng, Beibei
    Wang, Shiming
    Ren, Cheng
    Yang, Xingtuan
    Jiang, Shengyao
    Harbin Gongcheng Daxue Xuebao/Journal of Harbin Engineering University, 2015, 36 (11): : 1438 - 1442
  • [37] HTR-10全厂断电试验
    孙卫东
    贾立新
    周世新
    玉辰生
    李江博
    孙中民
    陈光建
    核动力工程, 2001, (06) : 513 - 515
  • [38] The R&D of HTGR high temperature helium sampling loop: From HTR-10 to HTR-PM
    Fang, Chao
    Bao, Xuyin
    Yang, Chen
    Yang, Yanran
    Cao, Jianzhu
    NUCLEAR ENGINEERING AND DESIGN, 2016, 306 : 192 - 197
  • [39] Error analysis and experimental research of HTR-10 burnup measurement system
    Wang, Jun-Ling
    Chen, Xiao-Ming
    Ma, Tao
    Xia, Bing
    Huang, Peng
    Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2013, 47 (04): : 614 - 618
  • [40] Performance assessment of auxiliary bearing in HTR-10 AMB helium circulator on the event of rotor drop
    Xiao, Zhen
    Yang, Guojun
    Li, Yue
    Shi, Zhengang
    Yu, Suyuan
    Hedongli Gongcheng/Nuclear Power Engineering, 2014, 35 (01): : 82 - 86