Retrieval scheduling in crane-based 3D automated retrieval and storage systems with shuttles

被引:12
|
作者
Dong, Wenquan [1 ]
Jin, Mingzhou [1 ]
Wang, Yanyan [2 ]
Kelle, Peter [3 ]
机构
[1] Univ Tennessee, Dept Ind & Syst Engn, Knoxville, TN 37996 USA
[2] Shandong Univ, Sch Control Sci & Engn, Jinan, Peoples R China
[3] Louisiana State Univ, Dept Entrepreneurship & Informat Syst, Baton Rouge, LA 70803 USA
关键词
Material handling; Crane-based 3D AS; RS with shuttles; Retrieval task scheduling; Optimization; AUTONOMOUS VEHICLE STORAGE; TRAVEL-TIME MODEL; RACK; OPTIMIZATION; AS/RS; WAREHOUSE; AVS/RS; LIFTS; DOCK;
D O I
10.1007/s10479-021-03967-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Retrieval task scheduling has been extensively studied for 2D automated retrieval and storage systems (AS/RS). A good schedule can significantly reduce the makespan for finishing a given group of retrieval tasks. However, the task scheduling problem has never been studied for crane-based 3D AS/RS with shuttle-based depth movement mechanisms (DMMs), which has become increasingly popular in practice. This study considered how to schedule a group of retrieval requests in a crane-based 3D AS/RS with shuttle-based DMMs with the objective to minimize the makespan. A mixed-integer programing model was developed to represent the problem, and the problem was proven to be NP-hard. Four heuristics were investigated for their computational performance. First-Come-First-Serve is the current practice while the Percentage Priority to Shuttle Reallocation with the Shortest Leg rule was developed based on the existing rule for scheduling storage and retrieval tasks in 3D AS/RS with conveyor-based DMMs. The Genetic Algorithm, which is popular for 2D systems, was adapted to deal with the 3D system. The Lowest-Waiting-Time-First heuristic was proposed based on the optimality condition of the scheduling problem and was demonstrated to outperform the other three algorithms in terms of solution quality and computational time. Further numerical results revealed insights for improving 3D AS/RS productivity. When the number of retrieval tasks is small (e.g., when a short planning horizon is adopted for high responsiveness), having more shuttles can improve the system performance. When there are many tasks to schedule, for example, in a situation with a long planning horizon, using a crane with higher speed rather than adding more shuttles can improve system efficiency more.
引用
下载
收藏
页码:111 / 135
页数:25
相关论文
共 50 条
  • [21] Blockage-free storage assignment and storage/retrieval scheduling in autonomous vehicle storage and retrieval systems
    Chen, Ran
    De Koster, Rene
    Yu, Yugang
    Guo, Xiaolong
    Yu, Hu
    NAVAL RESEARCH LOGISTICS, 2024, 71 (04) : 575 - 594
  • [22] Variable neighborhood search heuristic for storage location assignment and storage/retrieval scheduling under shared storage in multi-shuttle automated storage/retrieval systems
    Yang, Peng
    Miao, Lixin
    Xue, Zhaojie
    Ye, Bin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2015, 79 : 164 - 177
  • [23] Stochastic Storage/retrieval Scheduling Considering Shuttle Failure in Multi-shuttle Automated Storage and Retrieval System
    Wen, Jun
    Liu, Xinglu
    Yang, Peng
    2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 447 - 451
  • [24] Optimal Boundaries for Class-based Automated Storage/retrieval Systems Considering the Acceleration/deceleration of the Storage and Retrieval Machine
    Yang, Peng
    Qi, Mingyao
    Miao, Lixin
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 1400 - 1404
  • [25] Sequencing methods for automated storage and retrieval systems with dedicated storage
    Lee, HF
    Schaefer, SK
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (02) : 351 - 362
  • [26] Semantic Based 3D Model Retrieval
    Kassimi, My Abdellah
    Elbeqqali, Omar
    2012 INTERNATIONAL CONFERENCE ON MULTIMEDIA COMPUTING AND SYSTEMS (ICMCS), 2012, : 196 - 200
  • [27] 3D Model Retrieval Based on Skeleton
    Lin, Shujin
    Guo, Yihui
    Liang, Yun
    Chen, Qiang
    Wu, Yanhua
    PROCEEDINGS OF THE 2015 IEEE INTERNATIONAL CONFERENCE ON NETWORKING, ARCHITECTURE AND STORAGE (NAS), 2015, : 321 - 325
  • [28] Content based retrieval of 3D data
    Del Bimbo, A
    Pala, P
    PROGRESS IN PATTERN RECOGNITION, IMAGE ANALYSIS AND APPLICATIONS, 2004, 3287 : 13 - 24
  • [29] EVALUATION OF A CLASS-BASED STORAGE SCHEDULING TECHNIQUE APPLIED TO DUAL-SHUTTLE AUTOMATED STORAGE AND RETRIEVAL-SYSTEMS
    SARKER, BR
    MANN, L
    DOSSANTOS, JRGL
    PRODUCTION PLANNING & CONTROL, 1994, 5 (05) : 442 - 449
  • [30] 3D Sketch-Based 3D Model Retrieval
    Li, Bo
    Lu, Yijuan
    Ghunnman, Azeem
    Strylowski, Bradley
    Gutierrez, Mario
    Sadiq, Safiyah
    Forster, Scott
    Feola, Natacha
    Bugerin, Travis
    ICMR'15: PROCEEDINGS OF THE 2015 ACM INTERNATIONAL CONFERENCE ON MULTIMEDIA RETRIEVAL, 2015, : 555 - 558