Application of optimized grey discrete Verhulst-BP neural network model in settlement prediction of foundation pit

被引:37
|
作者
Zhang, Chuang [1 ,2 ]
Li, Jian-zhong [1 ,2 ]
He, Yong [1 ,2 ]
机构
[1] Cent S Univ, Minist Educ, Key Lab Metallogen Predict Nonferrous Met & Geol, Changsha 410083, Hunan, Peoples R China
[2] Cent S Univ, Sch Geosci & Infophys, 932 South Lushan Rd, Changsha 410083, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
Settlement prediction; Optimized discrete grey Verhulst model; BP neural network model; Combination forecasting model; Kalman filter model; REGRESSION-MODEL; DAM; BEHAVIOR; SYSTEM;
D O I
10.1007/s12665-019-8458-y
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Due to the low precision in the prediction of foundation pit settlement of the traditional grey Verhulst model, the optimized discrete grey Verhulst model was selected as the preferred method in settlement prediction. In this work, a combination forecasting model was proposed based on the optimized grey discrete Verhulst model and BP neural network to better predict the foundation pit settlement. For application of the proposed models, the settlement of the foundation pit of a building in Longcheng Industrial Park in Shenzhen, China was predicted. The optimized discrete grey Verhulst model was established on reciprocal transformation of the original data sequence by discretization method. In the modified forecasting model, the predicted result of the optimized grey discrete Verhulst model was used as the input sample value of the BP neural network model and the measured value was used as the target sample value of the neural network model. Furthermore, the neural network was trained to target accuracy and made predict. The maximum number of epochs was 5 x 10(5). The target error of training is set as 1E-6. The prediction results of these grey models were compared with the prediction results of Kalman filter model. And the two-way verification was carried out to verify that these grey models were suitable for the settlement prediction of the foundation pit. The predicted results of optimized grey discrete Verhulst-BP neural network model display that the average relative errors and mean square errors of the settlement predicted value of two monitoring points CJ12 and CJ23 were 0.0967%, 0.0002 and 0.0795%, 0.00006, respectively. The results revealed that the optimized grey discrete Verhulst-BP neural network model combined the advantages of the two models to achieve complementary advantages, which has higher prediction accuracy and stability. Comparison between the calculated results and the measured ones indicate that the proposed model could satisfactorily describe the settlement monitoring projects.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] Random prediction of surface settlement of subway foundation pit based on wavelet neural network
    Zhang, Bei
    Yao, Yafeng
    Ji, Jingchen
    [J]. Journal of Railway Science and Engineering, 2021, 18 (11): : 2899 - 2906
  • [22] Application of regularized ELM optimized by sine algorithm in prediction of ground settlement around foundation pit
    Han, Yalu
    Wang, Yong
    Liu, Chenyang
    Hu, Xinmin
    Du, Lizhi
    [J]. ENVIRONMENTAL EARTH SCIENCES, 2022, 81 (16)
  • [23] Application of regularized ELM optimized by sine algorithm in prediction of ground settlement around foundation pit
    Yalu Han
    Yong Wang
    Chenyang Liu
    Xinmin Hu
    Lizhi Du
    [J]. Environmental Earth Sciences, 2022, 81
  • [24] Optimized background value in grey Verhulst model and its application
    College of Economics and Management, Nanjing University of Aeronautics and Astronautics, Nanjing
    210016, China
    [J]. Kongzhi yu Juece Control Decis, 10 (1835-1840):
  • [25] Application of artificial neural network in settlement prediction of highway soft foundation
    Zhong, Cai-Gen
    Ding, Wen-Qi
    Wang, Mao-He
    Zhang, Sheng
    [J]. Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2003, 16 (02):
  • [26] Deformation Prediction of a Deep Foundation Pit Based on the Combination Model of Wavelet Transform and Gray BP Neural Network
    Liu, Qiang
    Yang, Chun-Yan
    Lin, Li
    [J]. MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [27] Deformation Prediction of a Deep Foundation Pit Based on the Combination Model of Wavelet Transform and Gray BP Neural Network
    Liu, Qiang
    Yang, Chun-Yan
    Lin, Li
    [J]. Liu, Qiang (liutanq007@aliyun.com), 1600, Hindawi Limited (2021):
  • [28] Application of BP Neural Network in Prediction of Ground Settlement in Shield Tunneling
    Hu, Min
    Zhang, Bin
    Lu, Mengdong
    [J]. 2021 IEEE/ACIS 20TH INTERNATIONAL CONFERENCE ON COMPUTER AND INFORMATION SCIENCE (ICIS 2021-SUMMER), 2021, : 29 - 35
  • [29] Study on a combined prediction method based on BP neural network and improved Verhulst model
    Niu, Tong
    Zhang, Lin
    Wei, Shengjun
    Zhang, Baoshan
    Zhang, Bo
    [J]. SYSTEMS SCIENCE & CONTROL ENGINEERING, 2019, 7 (03) : 36 - 42
  • [30] Foundation Settlement Prediction of High-Plateau Airport Based on Modified LSTM Model and BP Neural Network Model
    Feng, Jun
    Lu, Xiaomei
    Liu, Yanjun
    Wu, Jian
    He, Jizhe
    Chen, Zikang
    Zhao, Zhuoya
    [J]. POLISH JOURNAL OF ENVIRONMENTAL STUDIES, 2024, 33 (03): : 2037 - 2048