共 50 条
- [41] A Holonic approach for task scheduling in manufacturing systems [J]. 1996 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, PROCEEDINGS, VOLS 1-4, 1996, : 2511 - 2516
- [43] Fault-tolerant holonic manufacturing systems [J]. CONCURRENCY AND COMPUTATION-PRACTICE & EXPERIENCE, 2001, 13 (01): : 43 - 70
- [44] Layout Design and Reconfiguration in a Collaborative Manufacturing Network [J]. COLLABORATION IN A HYPERCONNECTED WORLD, 2016, 480 : 545 - 556
- [45] Development and Applications of Holonic Manufacturing Systems: A Survey [J]. Journal of Intelligent Manufacturing, 2006, 17 : 111 - 131
- [46] Distributed deadline control in holonic manufacturing systems [J]. MULTI-AGENT SYSTEMS AND APPLICATIONS II, 2002, 2322 : 351 - 362
- [48] From traditional manufacturing and automation systems to holonic intelligent systems [J]. 11TH INTERNATIONAL CONFERENCE INTERDISCIPLINARITY IN ENGINEERING, INTER-ENG 2017, 2018, 22 : 931 - 935
- [50] Holonic manufacturing scheduling: Architecture, cooperation mechanism, and implementation [J]. ARCHITECTURES, NETWORKS, AND INTELLIGENT SYSTEMS FOR MANUFACTURING INTEGRATION, 1997, 3203 : 224 - 235