CONSTRUCTION OF THE NORTH DORCHESTER BAY CSO STORAGE TUNNEL IN BOSTON

被引:0
|
作者
Davies, J.
Chin, K.
Ohnigian, J.
Stokes, J.
机构
关键词
D O I
暂无
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
This paper describes the successful management and construction of the 5.18 m (117 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long tunnel was mined through variable soft ground with only 6 m (20 ft) of cover, using an earth pressure balance tunnel boring machine. These extensive data collected from the projects unique automated and internet accessible geotechnical and TBM monitoring system, will be examined and used to explore the relationships between geological conditions, TBM operating parameters and measured settlements, The paper will also discuss the use of screw revolutions as an indicator of muck volume.
引用
收藏
页码:1062 / 1073
页数:12
相关论文
共 37 条
  • [21] Construction stages of the long span suspension Izmit Bay Bridge: Wind tunnel test assessment
    Diana, G.
    Yamasaki, Y.
    Larsen, A.
    Rocchi, D.
    Giappino, S.
    Argentini, T.
    Pagani, A.
    Villani, M.
    Somaschini, C.
    Portentoso, M.
    JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 2013, 123 : 300 - 310
  • [22] Mechanizing and construction result of world largest diameter tunnel for Trans-Tokyo Bay Highway
    Hunasaki, T
    Tohtake, N
    Imai, K
    CHALLENGES FOR THE 21ST CENTURY, VOL. 2: COMMUNICATION TUNNELS/MISCELLANEOUS INCLUDING WATER TUNNELS/MECHANISED TUNNELLING, 1999, : 543 - 552
  • [23] Challenges Associated with Arctic Construction A Case Study: The Early Years of Construction at Prudhoe Bay on Alaska's North Slope
    LaTona, Raymond W.
    SEVENTH INTERNATIONAL COLD CLIMATE HVAC CONFERENCE, 2012, : 287 - 294
  • [24] Central Artery Tunnel Project (CA/T) in Boston, Massachusetts, USA: Construction of diaphragm walls under limited headroom
    Himick, DE
    Schwank, S
    FOURTEENTH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND FOUNDATION ENGINEERING, VOL 3, 1997, : 1407 - 1410
  • [25] Development of design and construction concepts for jacked tunnel sections of I-93/I-90 interchange Central Artery/Tunnel Project, Boston, MA
    Rice, PM
    Mainville, PA
    Taylor, S
    Powderham, AJ
    GEO-ENGINEERING FOR UNDERGROUND FACILITIES, 1999, (90): : 570 - 581
  • [26] Development of design and construction concepts for jacked tunnel sections of I-93/I-90 interchange central artery/tunnel project, Boston, MA
    Rice, Philip M.
    Mainville, Peter A.
    Taylor, Stephen
    Powderham, Alan J.
    Geotechnical Special Publication, 1999, (90): : 570 - 581
  • [27] DESIGN AND CONSTRUCTION OF A SEGMENTAL LINING FOR A MACHINE-BORED TUNNEL - DELIVERY TUNNEL NORTH, LESOTHO-HIGHLANDS-WATER-PROJECT
    RICHARDS, JA
    REMMER, F
    SHARP, JC
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1994, 9 (01) : 91 - 99
  • [28] Construction of a three-aisle high bay Warehouse Special Bearing design for the Storage of Cardboard
    不详
    WOCHENBLATT FUR PAPIERFABRIKATION, 2011, 139 (04): : 262 - 263
  • [29] Analysis on the mechanical effect of metro tunnel construction of Chongqing North Station with zero distance stereo crossing
    地铁重庆北站零距离立体交叉暗挖施工力学效应分析
    1600, Chinese Society of Civil Engineering (50):
  • [30] Possibility of long distance and high speed construction in shield tunneling method - Case study on undersea tunnel project in Osaka Bay
    Adachi, T
    Hashimoto, T
    Tateyama, K
    Fukazawa, N
    MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 901 - 906