共 50 条
- [31] BRISENT: An Entropy-Based Model for Bridge-Pier Scour Estimation under Complex Hydraulic Scenarios WATER, 2017, 9 (11):
- [33] Assessment of the stability of a high bridge-pier due to ground excavations using FLAC3D FLAC AND NUMERICAL MODELING IN GEOMECHANICS, 2001, : 247 - 254
- [36] Dynamic response of concrete frame structure under a blasting demolition environment Electronic Journal of Geotechnical Engineering, 2014, 19 (Z7): : 17823 - 17837
- [37] Time-constrained demolition of a concrete cofferdam using controlled blasting Innovative Infrastructure Solutions, 2021, 6
- [38] Practical study on blasting-demolition methods of reinforced concrete building Doboku Gakkai Rombun-Hokokushu/Proceedings of the Japan Society of Civil Engineers, 1994, (498 pt 6-24): : 67 - 76
- [39] Failure Law of Supporting Part of Reinforced Concrete Chimney by Blasting Demolition PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 3250 - +
- [40] The Design of Blasting Demolition of the Reinforced Concrete Chimney Based on Complicated Conditions APPLIED MECHANICS AND MATERIALS II, PTS 1 AND 2, 2014, 477-478 : 803 - +