Design and verification test of the small absorber ball system of the HTR-10

被引:14
|
作者
Zhou, HZ [1 ]
Huang, ZY [1 ]
Diao, XZ [1 ]
机构
[1] Tsing Hua Univ, Inst Nucl Energy Technol, Beijing 100084, Peoples R China
关键词
Energy absorption - Gas cooled reactors - Mirrors - Pressure vessels;
D O I
10.1016/S0029-5493(02)00186-3
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
A small absorber ball system is the second shutdown system of the 10 MW High Temperature Gas-cooled Reactor-Test Module. When the control rod system is out of operation, the small absorber ball system is required to emergently shut down the reactor by means of boron carbide balls totally dropping into channels in the side reflector by gravity. Before the reactor re-operates, these small absorber balls must be conveyed from channels in the side reflector back to the ball storage vessels below the head of reactor pressure vessel by a pneumatic conveying process. Detailed design of the small absorber ball system was carried out, and all the components were manufactured. In order to check the performances of the small absorber ball system, a pneumatic conveying experiment and a hot test were carried out in the laboratory, and also a pre-operation of the small absorber ball system was verified on the reactor site at room temperature. Test data of the small absorber ball system show that all the parameters, including time of ball dropping, time of ball conveying back, indication of ball level in the ball storage vessel, gas flowrate, and valve operation states, are acceptable and reasonable. The small absorber ball system has been shown to be capable of performing satisfactorily at operating temperatures of the reactor. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:155 / 162
页数:8
相关论文
共 50 条
  • [21] Design of digital control system human-computer interface for HTR-10
    Sun, Shuan-Liang
    Wei, Li-Qiang
    Wang, Yu-Cheng
    Wang, Li-Shuang
    Feng, Jin-Mei
    Chen, Guang-Jian
    Hedongli Gongcheng/Nuclear Power Engineering, 2001, 22 (06): : 504 - 507
  • [22] A PARAMETRIC STUDY OF FUEL LATTICE DESIGN FOR HTR-10
    Wang, Meng-Jen
    Peir, Jinn-Jer
    Chi, Chen-Wei
    Liang, Jenci-Horng
    PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 2, 2011, : 481 - 485
  • [23] Design of intermediate heat exchanger (IHX) for HTR-10
    Li, Rizhu
    Li, Xiaotian
    Fu, Jiyang
    Gaojishu Tongxin/High Technology Letters, 2000, 10 (04): : 23 - 25
  • [24] Improvement of fuel handling control system of HTR-10
    Huang, Peng
    Hu, Shou-Yin
    Liang, Xi-Hua
    Hedongli Gongcheng/Nuclear Power Engineering, 2008, 29 (03): : 81 - 84
  • [25] Temperature Response of the HTR-10 during the Power Ascension Test
    Chen, Fubing
    Dong, Yujie
    Zhang, Zuoyi
    SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS, 2015, 2015
  • [26] Plant power cut-off test of the HTR-10
    Sun, Wei-Dong
    Jia, Li-Xin
    Zhou, Shi-Xin
    Yu, Chen-Sheng
    Li, Jiang-Bo
    Sun, Zhong-Min
    Chen, Guang-Jian
    Hedongli Gongcheng/Nuclear Power Engineering, 2001, 22 (06): : 513 - 515
  • [27] Improvement of monitor system of fuel handling system of HTR-10
    Ma, Tao
    Huang, Peng
    Hu, Shouyin
    Liang, Xihua
    Gaojishu Tongxin/Chinese High Technology Letters, 2007, 17 (09): : 953 - 957
  • [28] Study on the hydraulic pressure test of HTR-10 pressure vessel
    Liu, Junjie
    Zhang, Zhengming
    He, Shuyan
    Wang, Jinhai
    Gaojishu Tongxin/High Technology Letters, 2000, 10 (05): : 87 - 90
  • [29] Distributed control of HTR-10 fuel handling system
    Xiao, Hong-Ling
    Xiao, Wen
    Hedongli Gongcheng/Nuclear Power Engineering, 2002, 23 (01): : 24 - 27
  • [30] THE OPERATION CHARACTERISTICS OF THE FUEL HANDLING SYSTEM OF HTR-10
    Huang, Peng
    Liang, Xihua
    Chen, Xiaoming
    PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 1, 2011, : 33 - 39