Design and verification test of the small absorber ball system of the HTR-10

被引:14
|
作者
Zhou, HZ [1 ]
Huang, ZY [1 ]
Diao, XZ [1 ]
机构
[1] Tsing Hua Univ, Inst Nucl Energy Technol, Beijing 100084, Peoples R China
关键词
Energy absorption - Gas cooled reactors - Mirrors - Pressure vessels;
D O I
10.1016/S0029-5493(02)00186-3
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
A small absorber ball system is the second shutdown system of the 10 MW High Temperature Gas-cooled Reactor-Test Module. When the control rod system is out of operation, the small absorber ball system is required to emergently shut down the reactor by means of boron carbide balls totally dropping into channels in the side reflector by gravity. Before the reactor re-operates, these small absorber balls must be conveyed from channels in the side reflector back to the ball storage vessels below the head of reactor pressure vessel by a pneumatic conveying process. Detailed design of the small absorber ball system was carried out, and all the components were manufactured. In order to check the performances of the small absorber ball system, a pneumatic conveying experiment and a hot test were carried out in the laboratory, and also a pre-operation of the small absorber ball system was verified on the reactor site at room temperature. Test data of the small absorber ball system show that all the parameters, including time of ball dropping, time of ball conveying back, indication of ball level in the ball storage vessel, gas flowrate, and valve operation states, are acceptable and reasonable. The small absorber ball system has been shown to be capable of performing satisfactorily at operating temperatures of the reactor. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:155 / 162
页数:8
相关论文
共 50 条
  • [1] Verification test of second shutdown system of HTR-10
    Zhou, Hui-Zhong
    Huang, Zhi-Yong
    Diao, Xing-Zhong
    Yang, Nian-Zu
    Cao, Li
    Hedongli Gongcheng/Nuclear Power Engineering, 2002, 23 (01): : 45 - 48
  • [2] Design of the exhaust system in the confinement of the HTR-10
    Jiang, F
    Ye, SS
    Yang, J
    NUCLEAR ENGINEERING AND DESIGN, 2002, 218 (1-3) : 209 - 214
  • [3] The design features of the HTR-10
    Wu, ZX
    Lin, DC
    Zhong, DX
    NUCLEAR ENGINEERING AND DESIGN, 2002, 218 (1-3) : 25 - 32
  • [4] Design and tests for the HTR-10 control rod system
    Wu, QY
    Diao, XZ
    Zhou, HZ
    Huang, ZY
    NUCLEAR ENGINEERING AND DESIGN, 2002, 218 (1-3) : 147 - 154
  • [5] Digital signal processing on the fuel ball counting system for HTR-10
    Li, H
    Li, F
    NUCLEAR ENGINEERING AND DESIGN, 2003, 222 (2-3) : 139 - 146
  • [6] Design and commissioning of emergency power supply system of HTR-10
    Zhou, Shi-Xin
    Sun, Wei-Dong
    Jia, Li-Xin
    Yu, Chen-Sheng
    Hedongli Gongcheng/Nuclear Power Engineering, 2002, 23 (01): : 49 - 53
  • [7] A design of in-plant electric power system for the HTR-10
    Sun, WD
    Zhou, SX
    NUCLEAR ENGINEERING AND DESIGN, 2002, 218 (1-3) : 227 - 232
  • [8] Digital protection system in HTR-10
    Li, Fu
    An, Zhen-Cai
    Zhang, Liang-Ju
    Yang, Zi-Jue
    Hedongli Gongcheng/Nuclear Power Engineering, 2001, 22 (06): : 508 - 512
  • [9] The helium purification system of the HTR-10
    Yao, MS
    Wang, RP
    Liu, ZY
    He, XD
    Li, J
    NUCLEAR ENGINEERING AND DESIGN, 2002, 218 (1-3) : 163 - 167
  • [10] Modeling and computation of residual heat removal system of HTR-10 with experimental verification
    Chen L.-H.
    Zheng Y.-H.
    Ma T.
    Chen X.-M.
    Ma Y.-Z.
    Ma, Tao (mt@tsinghua.edu.cn), 1771, Atomic Energy Press (50): : 1771 - 1775