Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore

被引:109
|
作者
Hwang, Bon-Gang [1 ]
Zhu, Lei [1 ]
Ming, Jonathan Tan Tzu [2 ]
机构
[1] Natl Univ Singapore, Dept Bldg, Singapore 117566, Singapore
[2] Rider Levett Bucknall, 150 Beach Rd, Singapore 189720, Singapore
关键词
Project productivity; Green building construction projects; Critical factors; Criticality; EQUIPMENT TECHNOLOGY; LABOR PRODUCTIVITY; ACTIVITY LEVEL; INDUSTRY; WORKERS; IMPACT; DELAY;
D O I
10.1061/(ASCE)ME.1943-5479.0000499
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The construction of green buildings differs from that of traditional buildings in terms of the design, materials, and processes. The barriers to the development of green buildings, such as the high cost and project delay, further indicate that the productivity of green building construction needs to be tackled. This study aims to identify the critical factors affecting the productivity of green building construction projects by assessing the likelihood, impact, and criticality of the factors with comparisons against traditional projects. To achieve the objective, 26 factors were identified from a comprehensive literature review and interviews with industry experts. A questionnaire survey was then performed with 32 professionals experienced in green building projects, and three postsurvey interviews were also conducted. The results indicated that workers' experience, technology, design changes, workers' skill level, and planning and sequencing of work were the top five most critical factors affecting the productivity of green building construction projects. Furthermore, the differences in the criticality of the technical factors between green and traditional projects were remarkable, which should draw the practitioners' attention. The findings from this study not only fill a gap in the project management body of knowledge for green buildings but also help practitioners identify specific adjustments to traditional project management processes and practices achieving a more productive delivery of green buildings.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Critical factors affecting cost performance: a case of Ethiopian public construction projects
    Sinesilassie, E. G.
    Tabish, S. Z. S.
    Jha, K. N.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2018, 18 (02) : 108 - 119
  • [42] Exploring factors affecting owners' trust of contractors in construction projects: a case of China
    Tai, Shuangliang
    Sun, Chengshuang
    Zhang, Shoujian
    SPRINGERPLUS, 2016, 5
  • [43] Factors affecting construction labour productivity in Yemen
    Alaghbari, Wael
    Al-Sakkaf, Abubaker A.
    Sultan, Basel
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (01) : 79 - 91
  • [44] Construction Managers' Perception of the Factors Affecting Sustainability in Construction Projects
    Taheriattar, Reza
    Farzanehrafat, Morvarid
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2014, 5 (01): : 22 - 32
  • [45] EXPLORATION OF CRITICAL EXTERNAL PARTNERS OF ARCHITECTURE/ENGINEERING/CONSTRUCTION (AEC) FIRMS FOR DELIVERING GREEN BUILDING PROJECTS IN SINGAPORE
    Li, Yuan Yuan
    Chen, Po-Han
    Chew, David Ah Seng
    Teo, Chee Chong
    Ding, Rong Gui
    JOURNAL OF GREEN BUILDING, 2012, 7 (03): : 193 - 209
  • [46] Addressing Risks in Green Retrofit Projects: The Case of Singapore
    Hwang, Bon-Gang
    Zhao, Xianbo
    See, Yi Lin
    Zhong, Yun
    PROJECT MANAGEMENT JOURNAL, 2015, 46 (04) : 76 - 89
  • [47] Pathways to successful building green retrofit projects: Causality analysis of factors affecting decision making
    Liu, Tianyi
    Ma, Guofeng
    Wang, Ding
    ENERGY AND BUILDINGS, 2022, 276
  • [48] Critical Factors Affecting Quality in Building Construction Projects: Systematic Review and Meta-Analysis
    Gurmu, Argaw Tarekegn
    Mahmood, Muhammad Nateque
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (03)
  • [49] Failure factors of building construction projects in Ethiopia
    Abate, Hizkiel Haliso
    Mengistu, Desalegn Girma
    Abera, Tesfahun Asres
    AFRICAN JOURNAL OF SCIENCE TECHNOLOGY INNOVATION & DEVELOPMENT, 2024, 16 (06): : 860 - 880
  • [50] Integrating exploratory factor analysis and fuzzy AHP models for assessing the factors affecting the performance of building construction projects: The case of Ethiopia
    Ayalew, Girmay Getawa
    Ayalew, Genet Melkamu
    Meharie, Meseret Getnet
    COGENT ENGINEERING, 2023, 10 (01):