The Erlangen AMS facility: Status report and research program

被引:20
|
作者
Kretschmer, W
Anton, G
Bergmann, M
Finckh, E
Kowalzik, B
Klein, M
Leigart, M
Merz, S
Morgenroth, G
Piringer, I
机构
[1] Physikalisches Institut, Univ. Erlangen-Nürnberg
关键词
D O I
10.1016/S0168-583X(96)00610-6
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
We report on technical developments at the Erlangen AMS facility since 1993. These include modifications to the ionizer and sample changer, improvements in the vacuum system throughout the machine and the installation of new accelerator tubes. For sample preparation the full line from AAA pretreatment, oxidation to carbon dioxide and catalytic reduction to carbon has been established. For very small samples of less than 500 mu g carbon a new reduction facility with a total volume of 3.8 cm(3) has been built and is being optimized. We also give a short outline of the research programs currently being carried out and those planned for the near future.
引用
收藏
页码:93 / 96
页数:4
相关论文
共 50 条
  • [31] Status of the SINR mini-cyclotron AMS facility
    Chen, MB
    Lu, XS
    Chen, GS
    Xu, SL
    Shen, LG
    Li, DM
    Zhang, YX
    Gong, PR
    Zhang, YJ
    Zhou, WJ
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS, 1997, 123 (1-4): : 102 - 106
  • [32] Status report on the Frankfurt EBIS research program
    Kleinod, M
    Becker, R
    Kester, O
    Lakatos, A
    Mucke, M
    Pfisterer, B
    Rao, R
    Schneider, J
    Teske, L
    Thomae, H
    Zipfel, B
    PHYSICA SCRIPTA, 1997, T71 : 117 - 120
  • [33] Status report on the Frankfurt EBIS Research Program
    Kleinod, M.
    Becker, R.
    Kester, O.
    Lakatos, A.
    Muecke, M.
    Pfisterer, B.
    Rao, R.
    Schneider, J.
    Teske, L.
    Thomae, H.
    Zipfel, B.
    Physica Scripta T, 1997, T71 : 117 - 120
  • [34] The ANTARES AMS centre: A status report
    Tuniz, C
    Fink, D
    Hotchkis, M
    Jacobsen, G
    Lawson, E
    Smith, A
    Hua, Q
    Drewer, P
    Lee, P
    Levchenko, V
    Bird, R
    Boldeman, J
    Barbetti, M
    Taylor, G
    Head, J
    RADIOCARBON, 1995, 37 (02) : 663 - 673
  • [35] STATUS REPORT ON SPERT PROGRAM INCLUDING POWER-BURST FACILITY
    SILVER, EG
    NUCLEAR SAFETY, 1965, 6 (03): : 255 - &
  • [36] RADIOCARBON SAMPLE PREPARATION PROCEDURES AND THE FIRST STATUS REPORT FROM THE BRISTOL RADIOCARBON AMS (BRAMS) FACILITY
    Knowles, Timothy D. J.
    Monaghan, Paul S.
    Evershed, Richard P.
    RADIOCARBON, 2019, 61 (05) : 1541 - 1550
  • [37] Status report: Implementation of gas measurements at the MAMS 14C AMS facility in Mannheim, Germany
    Hoffmann, Helene
    Friedrich, Ronny
    Kromer, Bernd
    Fahrni, Simon
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS, 2017, 410 : 184 - 187
  • [38] THE ERLANGEN MULTIDETECTOR NEUTRON FACILITY
    BLANK, H
    BOTTCHER, J
    FINCKH, E
    FORSTNER, C
    GEISSDORFER, K
    HOLZER, N
    JAUMANN, W
    LIN, R
    SCHALL, G
    SCHNEIDEREIT, U
    STAUBER, K
    WEIPERT, A
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1985, 240 (02): : 311 - 315
  • [39] The AMS facility at Xi'an AMS Centre
    Zhou, Weijian
    Lu, Xuefeng
    Wu, Zhenkun
    Zhao, Wennian
    Huang, Chunhai
    Li, Linglang
    Cheng, Peng
    He Jishu/Nuclear Techniques, 2007, 30 (08): : 702 - 708
  • [40] AMS 14C sample preparation at the KCCAMS/UCI facility:: Status report and performance of small samples
    Santos, G. M.
    Moore, R. B.
    Southon, J. R.
    Griffin, S.
    Hinger, E.
    Zhang, D.
    RADIOCARBON, 2007, 49 (02) : 255 - 269