Planned intervention as a maintenance and repair strategy for offshore wind turbines

被引:0
|
作者
Karyotakis, A. [1 ]
Bucknall, R. [1 ]
机构
[1] UCL, Dept Mech Engn, London, England
关键词
D O I
暂无
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The UK is planning to develop a significant offshore wind turbine power generation capacity to contribute towards the reduction of greenhouse gas emissions from the electricity generating sector. The maintenance and repair of high numbers of offshore wind turbines represents a major challenge to ensure a reliable yet cost effective source of electricity. This paper examines 'planned intervention' as a possible operation and maintenance (O&M) strategy for large offshore wind farms. Computer-aided simulation employing the Monte Carlo method is used to examine the planned intervention maintenance strategy in terms of wind farm availability, cumulative energy output and production cost of energy.
引用
收藏
页码:27 / 35
页数:9
相关论文
共 50 条
  • [31] A reactive multi-component maintenance policy for offshore wind turbines
    Zhu, W.
    Fouladirad, M.
    Berenguer, C.
    SAFETY, RELIABILITY AND RISK ANALYSIS: BEYOND THE HORIZON, 2014, : 811 - 817
  • [32] Collaborative Unmanned Vehicles for Inspection, Maintenance, and Repairs of Offshore Wind Turbines
    Nordin, Mohd Hisham
    Sharma, Sanjay
    Khan, Asiya
    Gianni, Mario
    Rajendran, Sulakshan
    Sutton, Robert
    DRONES, 2022, 6 (06)
  • [33] Impact of condition monitoring on the maintenance and economic viability of offshore wind turbines
    Yan, Rundong
    Dunnett, Sarah
    Jackson, Lisa
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 238
  • [34] Human exposure to motion during maintenance on floating offshore wind turbines
    Scheu, Matti
    Matha, Denis
    Schwarzkopf, Marie-Antoinette
    Kolios, Athanasios
    OCEAN ENGINEERING, 2018, 165 : 293 - 306
  • [35] Preventive opportunistic maintenance strategy for wind turbines based on reliability
    Zhao, Hongshan
    Zhang, Lupeng
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2014, 34 (22): : 3777 - 3783
  • [36] An improved opportunistic group replacement maintenance strategy for wind turbines
    Ma, Zhiyong
    Wang, Dameng
    Wu, Shiming
    Teng, Wei
    Liu, Yibing
    ENERGY SCIENCE & ENGINEERING, 2020, 8 (10): : 3627 - 3637
  • [38] Optimization of maintenance scheduling for offshore wind turbines considering the wake effect of arbitrary wind direction
    Ge, Xiaolin
    Chen, Quan
    Fu, Yang
    Chung, C. Y.
    Mi, Yang
    ELECTRIC POWER SYSTEMS RESEARCH, 2020, 184
  • [39] Will 10 MW wind turbines bring down the operation and maintenance cost of offshore wind farms?
    Hofmann, Matthias
    Sperstad, Iver Bakken
    EERA DEEPWIND' 2014, 11TH DEEP SEA OFFSHORE WIND R&D CONFERENCE, 2014, 53 : 231 - 238
  • [40] Staggering offshore wind turbines
    不详
    MARINE POLLUTION BULLETIN, 2013, 77 (1-2) : 5 - 5